One decision this roadmap still forces
§14 (the project's direction) resolved the verification-endgame fork (verification is the goal). It converted the old "POSIX posture" question into milestone 19's real-workload sub-decision (reach binds now that "real workloads" is committed). What remains open, and what was decided about it once its trigger fired:
-
When the demonstrator becomes a competitor, if ever. §14 keeps a general-purpose competitor as an explicit later optionality, parked until the demonstrator earns it. The trigger to reopen it is concrete: a verified core that actually runs a real workload (milestone 19, BUILT), plus a reason the world needs another OS that the demonstrator has by then proved. Until both hold, competitor-shaped work (broad driver coverage, a full Linux ABI, a package ecosystem) is out of scope. Saying so keeps the demonstrator from sliding into a second, unfinished Linux.
A candidate answer to the second half now exists, and it is the first one ever proposed. DECISIONS §145, raised by calef 2026-09-05: compartmentalization at process cost. That is Qubes' stated mission, delivered without the hypervisor Qubes needs because Linux processes are not a security boundary. It is
PROPOSED. It recommends taking Qubes as a benchmark rather than a product target, so nothing in the paragraph below is loosened by it. Worth naming here because a parked question that never acquires a candidate has quietly become a no.The first half fired 2026-08-26, when the display ladder's rung two, milestone 33 (a compositor), landed. DECISIONS §131 (the competitor question) is that call, made. Hold at rung two and prove something useful on text mode first, rather than proceed to rungs three and four (real applications, GPU acceleration) on the strength of the technical trigger alone. The second half of this question is still open, on purpose, until that proof exists.