decisions AMENDED

201. One roadmap until a citation has to cross, and the blocked side declares the dependency

calef, 2026-09-20, on the three asks of the proposal the-roadmap-after-the-split. (Section number provisional until the merge queue lands it; §200 is in flight on another branch.)

Amended 2026-10-28 (UTC) on #2851: section 4 states the citation identity across repositories, answering the deferral in section 1. The moved-things registry lives at packages/moved.toml, not at design/roadmap/MOVED.

Amended 2026-11-01 (UTC) on #3034: the numbering namespace in section 4 moves with the record to nifeos/record, and nifeos/nife remains for history only.

The ruling, in one line. Keep option E, one roadmap in basalt, until the split makes a citation cross a repository boundary. Record the deferral rather than letting it happen by default. When the split comes, express a cross-repository dependency the way this tree already expresses an in-tree one, on the blocked side only.

1. The citation identity is deferred, deliberately

calef: "It seems like this is a deferrable decision once we split everything. So we could stick with E for now and then decide once we're working across multiple repos."

Why deferring is the right call here and not merely the cheap one. The expensive part of option C (the slug becomes the identity) was never the decision, it was the 3,148 citation sites that would have to resolve by something other than a bare number. Milestone 444 (a citation says what it cites) shipped the gloss ratchet on the morning of this ruling, and it converts those sites at the rate the tree changes. Waiting therefore makes C cheaper rather than dearer, which inverts the usual deferral trade. The decision's real input is also a thing this project does not have yet: what a citation across two live repositories is like to write and to read.

Two conditions make the deferral honest rather than passive.

The cost being accepted, stated because the options table underplays it. Under E the number stays hand-minted and global. Milestone 443 (lanes wait on each other for three reasons) made a collision cheap to resolve rather than impossible to have. Two sessions that cannot see each other still both reach for the next free number, and the integrator arbitrates at merge. That happened on the day of this ruling, when one lane reserved 449 to 490 and reported its ceiling so the maintainer could mint 491 to 516 above it. That coordination was a message between two agents, which is rung four, and after a split those sessions may not share a machine.

2. A cross-repository dependency is declared by the blocked side

calef's expected direction, recorded as direction rather than as a decision to build now: "I suspect we evolve to issues per repo and as we have cross repo issues we have deliverables in both repos that reference each other and express dependencies."

The half that is adopted. The edge between two repositories' work is the thing that genuinely has no home in either tree, and naming it is the right instinct: putting it in one repository makes that repository authoritative over another's schedule.

The half that is amended, and the amendment is the whole of this clause. Deliverables in both repositories referencing each other means two records asserting one relationship. That is DECISIONS §90 (the claim is a draft pull request)'s "the same fact in two places", and it drifts in the worst direction: the blocker is built and updated, and the blocked side still says it is waiting. This tree has that failure on file, in milestone 16 (real hardware + IOMMU-backed driver isolation), which listed three things as remaining when two were finished, and calef caught it by asking rather than any mechanism catching it.

So: one writer per fact, which is what the tree already does. Every non-BUILT block carries a Gate: line, and MILESTONE N in it means this waits on that. The dependency is declared by the thing that is blocked and never by the thing that blocks. Extending it across repositories is a spelling change rather than a new mechanism: the blocked repository's block says what it waits for, and the blocking repository says nothing and needs to know nothing.

The caveat against this ruling's own recommendation. A one-sided cross-repository gate is only machine-checkable if the checking repository can see the other's records, which is the proposal's option D and its stated cost: a gate whose answer depends on what the operator has cloned. Under E that is moot, since there is one roadmap. It becomes live at exactly the moment the split happens, which is a third reason the MOVED file earns its place at the split rather than after it.

3. Issues, for the two things a tree cannot do

Adopted as asked. GitHub Issues are for a stranger's bug report on a released artifact (they have no commit bit and no checkout) and for cross-repository coordination that is not a dependency. Not for milestones, not for status, not for claims, and not for the argument behind a piece of work, which stays in the tree. AGENTS.md's third principle is that a newcomer succeeds with only this repository, and an argument in a tracker fails that for anyone with a clone and no network. Twenty-one scripts under script/ read design/roadmap/ directly, and every one of them is a reason the record stays readable offline.

The proposal's own prior art is the evidence: all eight projects it checked keep the durable record in a versioned tree.

4. The citation identity across repositories

Ruled 2026-10-28 (UTC), on the question section 1 deferred, ahead of the first code cut (milestone 756 (process-tools, core-tools and disk-tools are the first code to leave this repository)), the revisit event section 1 defines. The rule, in force now:

What is not decided here

Whether a component repository ever needs numbered records of its own. Section 4 arms that trigger; until it fires, one numbering namespace, the record repository's, covers every record.