decisions AMENDED

203. Capacity is rented rather than bought, and what each of the three benches is still for

calef, 2026-09-20, after a conversation that re-derived a hardware decision he had already converged on elsewhere and which this tree had never recorded. (Section number provisional until the merge queue lands it.)

The goal, in his words: "unleash capacity and move the roadmap 2-3x faster", with the budget freed by reducing inference spend rather than increased.

The ruling

Rent. Do not buy a machine. Rented capacity is elastic, API-driven, needs no capital, and bare metal you install your own operating system on is open enough for nife to run on it.

§299 (the build machine is bought) amends this ruling for one machine, galapagos, which buying repaid within a year.

Why buying lost, with the numbers that decided it

A bought machine was weighed seriously and priced against what this tree measures. Two candidates were considered: a top-end Framework Desktop (Strix Halo, 128 GB unified, open platform, x86_64, which calef had converged on in an earlier conversation) and a faster closed appliance. Neither survives the goal above.

What runners buy, ranked by measured effect

Measured from this session's CI: a full run on real code takes 23 to 29 minutes; runs on documentation-only branches finish in 2 to 3 because nearly every job skips.

  1. Lane concurrency, which is the large one. Lanes gate locally today: three architectures of script/test, script/verify at about 3.5 GB a harness, mutation sweeps, all on one laptop. That is the three-to-four lane ceiling, the out-of-memory kill, and the 1.9 GB-free scare. Renting moves that work off the machine a person is also using.
  2. Hardware-gated milestones become gate-able. Milestone 16 (real hardware and IOMMU-backed driver isolation) says its own gate is "not the 'no board' kind: the board is on the desk. The remaining work needs somebody sitting at it". Rented metal with a power API and a serial console removes the person from that loop.
  3. Merge throughput, which is real but third. The queue already batches up to five and group builds finish in minutes on ordinary changes. GitHub's concurrency and a 16 GB hosted runner that forces VERIFY_JOBS=2 bind on heavy branches rather than on a typical day.

This ranking was amended on 2026-09-24 by §214 (the Team plan buys runner concurrency). Once lanes gated in CI, merge throughput bound on an ordinary day, and calef upgraded the organization to GitHub Team for its 60 concurrent jobs. The ruling above is unchanged; §214 has the measurements and the new order.

Milestone 488 (a self-hosted CI runner) is refused twice and its security half is answered rather than ignored: a runner restricted to this repository's own branches, with pull requests from outside staying on hosted runners. That is the shape that clears the objection, and it is a condition on any runner this decision buys.

The three benches, ranked by what only they can do

calef's ranking, confirmed against the records:

One correction to that ranking, and it is why xenon is not retired. xenon is a Core i5-7500T and the tree holds per-machine measurements keyed to it, including the fastpath footprint at 8,404 bytes against its 32 KB L1i, 26%. A rented machine of another microarchitecture is not like-for-like, and re-baselining costs more than the box is worth. It is the least valuable bench to sit at, not the least valuable record.

The asymmetry this creates, stated because parity is a gate

Moving hardware legs to rented runners covers aarch64 and x86_64 and leaves riscv64 bench-bound unless rental exists. Under DECISIONS §19 (architectural parity is a tenet) parity is a gate rather than an aspiration, so a plan that quietly covers two of three architectures reads as full coverage six weeks later. It is written here instead.

And riscv64 rental does exist, which was checked rather than assumed. Scaleway's Elastic Metal RV1 is a T-Head TH1520 (C910, RV64GC), 4 cores at 1.85 GHz, 16 GB, 128 GB eMMC, at €0.042 an hour or €15.99 a month. It comes with a serial console over SSH, command-line provisioning, and support for installing "the most exotic operating systems". It is a Labs product with no SLA.

It is not a radon substitute and is better than one in a different way. The TH1520 is a different SoC from radon's JH7110, so booting nife there is a port (a UART at another address, its own device tree, whatever its firmware hands over) rather than a switch. That makes it a second RISC-V implementation, which is what catches an assumption baked into one vendor's silicon, and it means baseline continuity stays with radon. The port is proposed as its own milestone rather than assumed here.

What is not decided

Which provider, and the spend split between inference, runners and bare metal. calef has said any of the three architectures is acceptable, which settles the constraint this section needed.

The riscv64 provider was decided on 2026-09-25: §215 (the second RISC-V machine is a rented Scaleway Elastic Metal RV1). aarch64, x86_64 and the spend split remain open.