259. A multicore soak counts toward risk 5 at ten million crossings over three boots
The ruling
calef answered "B" on 2026-10-07 (UTC) to the question design/fatal-risks/multicore-reliability.md
asks in its item 4 and milestone 201 (is multicore reliability converging)'s Follow-on asks again: how long must a multicore soak run
before a board's rows count toward risk 5's verdict.
A board's exposure rows count toward the verdict for an architecture once that architecture has
at least 10 million crossings across at least 3 boots, stated before the run. Crossings are the
crossings= counter at the last beat, the unit calef ruled the curve is judged on on 2026-09-25.
Why
Rule of three: zero defects in N trials bounds the rate below 3/N at 95% confidence. Ten million crossings with zero defects rules out a rate above about 1 in 3.3 million. The boot minimum is there because each boot is one draw of the placement lottery, and radon's 4.1 million crossings are almost all one boot (E4).
What it means for each board
- radon needs about 6 million more crossings over at least 2 more boots.
- xenon needs the full 10 million, over at least 3 boots.
- argon needs the same, and sits behind its own delivery.
Defects do not reset the count
A defect found during a soak stays on the curve and the count carries on. The verdict reads the slope per architecture, not a clean streak. The bar says when there is enough exposure to read a slope, not when the answer is green; a flat curve is still a confidence and never a proof.
Refused
- 4 million crossings over any number of boots. One draw already meets it, so it is not a bar.
- 30 million crossings over 5 boots. It costs about 52 more radon hours for a bar nothing yet needs. A later ruling can raise it if the curve asks for more.