nife: user journeys
Name: ratified 2026-08-26 (calef's own word: "I'd like to start tracking user journeys"), not a lane's choice to make provisional.
A journey is an end-to-end, user-facing story, told as an ordered bundle of the milestones (and,
where a step is blocked by one, the decisions) that have to be true at once for someone to actually
live it. design/roadmap/ tracks work item by item; a journey is the read that answers a different
question than any single milestone can: could a person actually do the whole thing today, start to
finish? Journey 1 (login to kilo) is the worked example this directory was minted from: no single
milestone was "blocked," but tracing the story end to end found a real, unowned gap (milestone 177)
that nothing surfaced by scanning the roadmap milestone by milestone.
How this directory works
One journey, one file, named NN-slug.md (single digits zero-padded so the directory sorts, the
same convention design/roadmap/ uses). calef, 2026-08-26, on adding the second journey: numbers
should be the shorthand identifier, cited as journey N in prose, the same shape milestone N
already has. A journey's number is its identity, the way a milestone's or a decision's is:
journey 1 is 01-login-to-kilo.md and nothing else. Roadmap blocks, decisions and notes cite a
journey by number, so the number is load-bearing: the filename and the H1 have to agree, and
script/journeys --check fails a file where they do not.
The frontmatter
Every journey opens with frontmatter, and it is the only place a journey's status lives. The format
is the one design/decisions/ and design/roadmap/ use: ---, flat key: value lines, ---; no
lists, no nesting, dates UTC.
---
status: PARTIAL
raised: 2026-08-30
---
| key | values | required when |
|---|---|---|
status |
PROPOSED, WORKING, PARTIAL, DELIVERED, RETIRED |
always |
raised |
YYYY-MM-DD, UTC |
always |
retired |
YYYY-MM-DD, UTC |
RETIRED; refused on every other status |
| status | means |
|---|---|
PROPOSED |
A story the project intends to tell, and no cited milestone is BUILT yet. |
WORKING |
Somebody is on it now. |
PARTIAL |
Some steps are delivered, more remain, and nobody is on it. |
DELIVERED |
Every cited milestone is BUILT: a person can do the whole thing today. |
RETIRED |
The project stopped telling the story. The file stays, and retired says when. |
The number stays in the filename and the title in the H1, as a milestone's and a decision's do.
There is no title:, number: or delivered: key: script/journeys derives the delivered date
from the latest built date among the cited steps.
Progress stays computed. script/journeys counts the steps sitting on a BUILT milestone on
every run, because a hand-written count drifts the moment one step moves. There is no progress
token, and a journey's prose never restates the status or a date as a field-shaped line.
script/journeys --check fails a file with no frontmatter or no status, a status outside the five
words, a raised or retired that is not YYYY-MM-DD, a retired on any status but RETIRED, a
RETIRED journey with no date, a DELIVERED journey citing a milestone that is not BUILT, and a
PROPOSED journey citing a milestone that is BUILT.
Index
GitHub renders this README as the directory index. script/journeys is the live view, with each
journey's status; this table is the identity mapping only: "what number is this", never "what state
is it in". Neither design/roadmap/ nor design/decisions/ keeps an index any more, and the reason
they can afford not to is that nothing there needs a second copy of a number.
The format
A journey file is the frontmatter above, a short narrative (what the story is, why it matters, and what "done" looks like), and one table:
| step | milestone | decision | what this step needs |
|---|---|---|---|
| 1 | 33 | one line naming what this step of the story needs from that milestone |
- step. Ordinal, for reading order only;
script/journeysdoes not enforce that a lower step finishes before a higher one starts; some journeys have steps that are genuinely independent (journey 1's own steps 3 and 4 are unordered with respect to each other, and its own prose says so). - milestone. The milestone number this step's progress is read from. Required, and the block it names must exist.
- decision. A decision's number, written without
ยง, when that decision blocks this specific step as well as the milestone: aPARTIALmilestone can still have the one piece a journey needs sitting behind a separately-decided hold, and journey 1's step 4 carries a decision for that reason. Blank when the milestone's own status is the whole answer. - what this step needs. One line, human-written, naming the specific slice of that milestone
this journey's story needs, not the milestone's full scope. This is the column a milestone's own
coarse status cannot carry:
PARTIALsays nothing about which part is missing.
Every journey carries at least one step row, and --check fails a file with none.
The task: add a journey
-
Write
design/journeys/NN-<slug>.md, the number zero-padded so the directory sorts. It opens with frontmatter, then# N. <title>:--- status: PROPOSED raised: 2026-10-29 --- # N. <title>The keys and the rules for each status are under The frontmatter above. The prose may not restate them.
-
Tell the story: what it is, why it matters, and what a person can do at the end of it. Journey 1's
## What "done" looks likesection is the shape. -
Add the step table, one row per step. Each row names the milestone, the decision when one also blocks the step, and the slice of the milestone the story needs. The columns and their rules are under The format above.
-
Run
script/journeys --check, thenscript/journeys Nto read the story against the blocks. -
That is the whole procedure: no table to update, no regeneration to wait for. A lane picks the next free number provisionally, and the integrator mints it at merge like every other global name.
Reading a journey's state
script/journeys prints the status, the raise date and, where they apply, the retired and delivered
dates from the frontmatter and the cited steps. Then it prints, per step, the milestone's status
from its block and (when a decision is cited) that decision's status from its frontmatter, and a
one-line rollup of how many steps sit on a BUILT milestone. A step whose milestone is BUILT but
whose cited decision is not DECIDED in the direction the step needs still reads as blocked; the
tool does not try to parse which way a decision went; it says what a step needs and lets a reader
hold the decision's own text against it.
The report is not a gate, and the schema is one. Nothing fails a build over a journey's
progress: a step is an editorial claim about what a story needs, and the rollup can regress when a
milestone is re-scoped down to PARTIAL without that being a defect for CI to catch. What
script/lint gates is the record, through script/journeys --check: the shape, the vocabulary, a
raised and retired that are dates, the retired pairing, and the status against the milestones
its steps cite. CI and the pre-push hook run it with the rest of lint.