The Kani runner shutdown flake, measured
Name: provisional, minted 2026-11-16 (UTC) by lane/kani-shutdown-known-flake.
Sometimes a prove shard of verify.yml fails in the merge queue with no proof failure behind it,
because the hosted runner goes away mid-job. This note holds the measurement, the reason a rerun
cures it, what the known-flakes signature matches, and a second failure mode it does not match.
Every date is UTC.
Measurement
Across the 97 finished merge-queue attempts from 2026-11-15T10:38Z to 2026-11-16T00:21Z, 24 (25%)
lost a Kani prove shard. They split in two.
Sixteen jobs failed in 2.2 to 3.3 minutes. Each log carries ##[error]The runner has received a shutdown signal, then a cancellation line. Pull requests 3567, 3574, 3603, 3606, 3608,
3609, 3611, 3612, 3616 and 3621 each lost one or more attempts this way. The one log read in full
(run 43776160228, prove (shard 1/5)) shows the line arriving 2.7 minutes into the job, while a
harness check was running.
At exactly 30.0 minutes the service cancelled eight prove (shard 2/5) jobs. Nobody can
read their logs: the log API answers BlobNotFound.
No Kani proof failure appeared in any log that opened.
Why a rerun cures it
The shard is idempotent. In .github/workflows/verify.yml a prove job holds contents: read
and nothing more. It checks out the tree, restores the Rust cache (a merge group never saves it), installs Kani, runs script/verify --shard N/5 and prints a memory record. It writes
nothing that a later attempt reads, so the same shard on the same tree gives the same verdict. A
runner taken away says nothing about the proofs. The matrix sets fail-fast: false, so the other
shards still report.
What the signature matches, and what it does not
helpers/known-flakes.tsv lists kani-shutdown. Its signature is a line that starts with a prove (shard N/M) job name and carries ##[error]The runner has received a shutdown signal. That is as narrow
as the failure's own wording, and the job name scopes it to a prove job.
- The log has to come from the whole job.
helpers/arm.shmatches a signature againstgh run view <run> --log-failed, which prints only steps that concludedfailure. When a shard's runner dies, the step endscancelled, so that command prints nothing for the shard. All 23 failed verify merge-group runs of 2026-11-15 show this, and none had a shard step that concludedfailure. Sohelpers/arm.shalso reads the whole log of any failed job that has a cancelled step. It leads each line with the job name and a tab, the form--log-faileduses.helpers/push-requeue-selftest.shcovers a killedproveshard and a killed job of another name. - A real proof failure does not match. Its step concludes
failure, its log has no shutdown line, and the aggregateverify (Kani proofs)job is the only other failed job. - The signature does not cover the 30.0-minute cancellations. Nobody can read their logs, so no signature
matches them. They still need
--despite-failed-checks.
Open: what stops a shard at 30.0 minutes
The prove job has timeout-minutes: 25 and its proving step 21, so 30.0 is neither limit. Two
facts came from the logs and the API. The check run's annotation on the cancelled shards examined says The job has exceeded the maximum execution time of 25m0s. In one of them (run 43772203707, pull request 3611)
the proving step stopped reporting 1.5 minutes after it began, yet the job stayed open until 30.0
minutes after it started. That fits a runner that stopped answering the service early, with the
service giving up 5 minutes after the job limit. Nothing read here shows the 5 minutes to be a
documented grace period, or the cause to be a lost runner. Nobody knows whether those shards ever ran their
proofs. The next step needs a cancelled shard whose log is still readable, or GitHub's
account of how it closes a job whose runner has gone silent.
When to remove the line
Remove it when shards stop losing their runners, or when the line has gone a month without matching a removal.