notes

Pilot results: Opus 5 against Opus 5.5, twelve runs on three tasks

Name: provisional (2026-09-25). Results for the protocol in pilot-protocol.md, committed as 0cde39d20 and landed by #1259 before the first run. Runs went from 2026-09-24 21:35 to 2026-09-25 03:13 UTC.

The short answer is that the pilot worked as an instrument, and it shows no difference on correctness that two runs per cell can carry. It shows two differences that repeated in both runs of a cell, and they point in opposite directions. On the maintainer task, Opus 5.5 put the one real decision to calef both times and Opus 5 did not, but both Opus 5.5 runs committed a tree that fails the gates, while both Opus 5 runs left it green. On the same task Opus 5.5 took a quarter of the time and money. Task (c) did not fit in the time box for three of its four runs, so it compares nothing.

Results, per run

Scores come from the blind grader. Wall time, cost and tokens come from each session's own result events. Cost is missing for a run killed at the wall clock, because a killed session writes no result.

task model run cause, fix (a: fixes, decision, verified) process /3 claims wrong gates wall min cost $
a Opus 5 R01 2, 1, 2 2 1 pass 15.2 3.73
a Opus 5 R07 2, 1, 2 2 1 pass 11.3 3.91
a Opus 5.5 R05 2, 2, 2 1 0 fail 3.0 1.16
a Opus 5.5 R11 2, 2, 2 1 1 fail 5.8 0.71
b Opus 5 R06 2, 1 2 0 pass 15.0 3.95
b Opus 5 R09 2, 1 2 0 pass 19.7 7.85
b Opus 5.5 R10 2, 1 2 0 pass 16.6 5.40
b Opus 5.5 R03 2, 2 2 0 pass 8.9 2.20
c Opus 5 R04 2, 1 2 n/a (killed) fail 60.0 n/a
c Opus 5 R02 2, 2 2 n/a (killed) fail 60.0 n/a
c Opus 5.5 R12 2, 2 2 1 fail 24.3 11.31
c Opus 5.5 R08 2, 2 2 n/a (killed) fail 60.0 n/a

Task (a), the relayed lane report

Every run glossed the stale weekly.csv line. Every run checked AGENTS.md, found no comment-ratio sentence, and recorded roadmap 350 as dissolved rather than forwarding it. Every run measured script/lint on the base and reported it green, refuting the report's claim. The split was item 3, the rename.

Task (b), decision dates

Every run found the cause, milestone 114 (split DECISIONS.md, and give a decision a status). Every run corrected the dates by tracing section headings through DECISIONS.md's history. Every run ended with the gates green. All four also added the frontmatter that §212 (a prose budget: 3,000 words of main body) and §213 (writing standards: three countable rules, one review rule, and a ratchet) lacked on this base (deviation 2 below). An automated comparison against 9b023e228 scores the dates.

Task (c), uefi_loader's mutants

Every run found the true cause: arch and chooser are modules only the feature-gated binary compiles, so their mutants are unbuilt, not surviving. Every run moved to exclude them. Every run also ended red.

Totals per model

model runs finished wall min (all 6) cost $ (finished) tokens (all 6) of which cache reads output tokens
Opus 5 4 of 6 181.2 19.44 over 4 79,227,992 78,136,987 150,347
Opus 5.5 5 of 6 118.6 20.78 over 5 36,257,218 35,326,173 160,992

Cache reads are nearly all of the token count, as notes/what-a-session-carries.md found for maintainer sessions. Over the finished runs alone the two models used about the same tokens (23.1M and 24.4M), and Opus 5.5 finished one more run.

Output tokens for a killed run are a floor, not a count. Without a result event the pilot sums the per-message usage in the stream, and the stream's usage records carry only part of the output. The input and cache figures are complete.

Task by task:

Grading cost $2.42 in one session.

What n = 2 per cell supports, and what it does not

The protocol fixed this before the runs. A difference counts only if it is total: both runs of one model on one side of both runs of the other. A cost or time ratio counts if it is two or more in both runs.

Three results meet that bar, all on task (a):

Nothing else does:

The (a) results do not add up to "one model is better". They are two different failure shapes. One model under-routed a decision to its owner; the other committed without re-running the gate it had just reported. This tree already has mechanisms for both: script/names and the naming rule for the first, the pre-push hook and "read the gate's exit" for the second. A pilot on host clones with no hooks installed removes the second mechanism, which may be exactly why it showed.

No test of significance was run, as the protocol said, and scores are not averaged across tasks.

Whether a larger run is worth it

The protocol's test has two parts: did a cell show a difference a larger n could confirm, and would confirming it change which model a lane is launched on? Task (a) passes both. A three-to-five-fold cost and time gap on maintainer work would change the choice, if it held, and so would a consistent split on routing decisions to calef. Tasks (b) and (c) do not pass as run.

The recommendation is a second round, narrower and fairer:

Round 2 is deferred by the architect until after the travel week that begins 2026-09-28. calef, on 2026-09-26: "Defer the model comparison until I return."

Deviations from the protocol

  1. Six runs were cut off by the session limit and rerun. At 2026-09-24 22:27 UTC, every run launched after that point (R02, R03, R04, R08, R09, R12, three of each model) ended within three turns with "You've hit your session limit". Those attempts are kept in the pilot's scratch as -truncated-attempt1 and scored as nothing. Each was rerun after the reset at 00:20 UTC under the same label, brief and base. None of the six had changed anything in its clone.
  2. Task (b)'s base is lint-red before any change. At b24b2e491, §212 and §213 have no frontmatter and the generated index is stale, so "gates green" was scored as ending green. All four runs fixed the pre-existing failure.
  3. The grader ran as a headless session, not a subagent. The Agent tool refused a new subagent (the concurrent limit was reached). The grader ran as claude -p --model claude-opus-5-5 in a directory holding only the twelve scrubbed packets, the protocol and the task list. That is the model the subagent would have inherited. Opus 5.5 therefore graded its own runs blind, which the protocol's BUGS already names.
  4. Wall time is the pilot's clock, not the session's. A session woken by a background task after its report emits a second result. Two runs did (R10, R12). Their time is measured from launch to the transcript's last write, and their tokens and cost are summed over both results.
  5. A false rate-limit stop. The resumed driver's limit check matched the stream's routine rate_limit_event records, whose status was allowed. It stopped after one pair. That pair (R09, R03) had finished normally and was gated by hand. The check was narrowed to a rejected status and the last two pairs ran.

BUGS