A multi-tasking workload benchmark: the appendices to milestone 168
Milestone 168 (a multi-tasking workload benchmark) carries what
the instrument is for, what was built, the 2026-10-04 radon reading, its BUGS and its Follow-on.
This directory carries the earlier reading and the instrument change its prose budget has no room
for.
radon-2026-09-16.md: the first five radon boots with the old instrument, the within-boot spread attasks=4, and the census correction.holes-closed-2026-09-19.md: the lane of 2026-09-19 that changed the statistic and the mix, what it found on the way, the HVF attempt, and the two proposals it absorbed.
Name: provisional. The directory follows ยง212 (a prose budget)'s siting default,
design/roadmap/X/ beside design/roadmap/X.md. calef names directories.
radon-2026-09-16Name: provisional. After the parent's "What five boots measured, radon, 2026-09-16". calef names files.holes-closed-2026-09-19Name: provisional. After the parent's "What changed on 2026-09-19: the two holes, closed without a board". calef names files.