roadmap BUILT

276. The dashboard counts milestones and decisions by status, and names not at all

Built 2026-09-11. Minted the same day by calef, from asking whether the metrics dashboard carried naming data and finding it does not. (Number provisional until the merge queue lands it; milestone 275 is in flight ahead of it.)

It gated on nothing while it ran, which was the block's own reading of it: not a design fork, because script/names already computed the counts and script/metrics already had the machinery to read a historical tree in bulk. Both held. The only thing that had to be built rather than reused was the enumeration.

The gap, stated plainly

notes/project-metrics/weekly.csv carries 34 columns. Milestones get seven, broken out by their full status vocabulary (built, partial, in_progress, removed, not_started, optional, recorded). Decisions get six the same way (decided, amended, superseded, proposed, unrecorded). Names get none, despite having an exactly parallel four-word vocabulary that script/names already computes and reports: ratified, recorded, provisional, unrecorded.

Today that reads 101 unratified of 205: 0 unrecorded, 37 recorded (a ruling only), 64 provisional. Nothing shows whether those numbers are climbing or falling week over week, which is the one thing the other status columns exist to make visible.

Scope added 2026-09-11, after the block was minted

A sixth column, proposals_unnumbered. calef, the same day, from the same question one record over: design/roadmap/proposals/ holds 81 unnumbered proposals and nothing on the dashboard counts them. That is not an omission anyone made. milestones() matches index rows in design/roadmap/README.md and keys on a milestone NUMBER, and a proposal is defined by not having one (milestone 247, follow-on work named by a finished milestone goes nowhere, and this is the third time). The pile is invisible to that count by construction. The three proposals/ strings in that README are links inside other blocks' prose, not rows.

It belongs here rather than in a milestone of its own for the reason the naming columns do: script/roadmap --proposed already computes it, and the work is a column and a parse to share.

The honesty clause applies differently to it, and copying the naming one across would have been wrong. That is recorded in BUGS below and argued on the page.

What to build

  1. Columns mirroring the existing pattern: names_ratified, names_recorded, names_provisional, names_unrecorded, names_total. Follow milestones() and decisions() in script/metrics rather than inventing a third shape.
  2. A chart, if it earns one. The existing page renders series that move. If this one turns out to be a near-flat line plus a slowly-growing provisional count, a table row may serve better than a plot; that is the builder's call from the data.
  3. The caveat on the page, not just in this block. See below. It is the part most likely to be dropped as "obvious" and it is the part that keeps the number honest.

Two things that make this harder than the existing columns

The data is spread across every named thing, not in one index file. milestones() and decisions() each parse a single README. Naming provenance lives at the name (milestone 115's whole design: the crate header that would carry a refusal is what a proposer actually reads). The computation has to read every program, crate, package manifest and script/ entry point in that week's tree. script/metrics already streams a whole tree's blobs in one git cat-file --batch, so the machinery exists; the cost is the enumeration, not the reading.

The early weeks will read as zero, and that is an artifact rather than a fact. The series starts 2026W29 (2026-07-15). Provenance blocks did not exist until milestone 115, 2026-08-04 (2026W32). So three weeks of this series would show no ratified names, not because nothing was ratified but because the convention that records ratification had not been invented. script/metrics' own header already warns that "every row is a RESTATEMENT, not a report... regenerated from git history by applying TODAY's definitions to old commits". This series is the sharpest instance of that hazard in the file, and the page should say so where those weeks are rendered rather than leave a reader to infer a trend from a convention's birth.

BUGS

What was built

Five columns and a chart, in notes/project-metrics/weekly.csv and names.svg. At 2026W36: 204 names, 104 ratified, 37 recorded, 63 provisional, 0 unrecorded, which is script/names' own table to the digit from a different walk of the tree.

The parse is shared rather than copied (helpers/name_provenance.py, a provisional name), which is milestone 236's (three derivations are copied between scripts, and nothing notices when they drift) rule applied the moment the dashboard became a second reader of these blocks. script/names keeps its file walk and script/metrics keeps its git ls-tree, because a gate is asked about the tree in front of it and a report is asked about eight revisions nobody has checked out. That is the same line helpers/rust_source.py already draws. script/names' output is byte-identical on every mode, checked against the pre-refactor run on stdout and stderr both.

A chart, and it earned one. The series was expected to be a near-flat total plus a slowly-moving provisional count, which a table row would have served better. It is not: the bar goes 16, 40, 119, 135, 152, 175, 188, 204, Unrecorded collapses from 60 to zero in one week, and Provisional more than triples in the same week. A stacked bar shows all of that at once and a table row would have shown a number climbing.

names_total is every named thing, not the sum of the four columns, which is the one place this deviates from milestones() and decisions() and it is deliberate. The four words are what a Name: block says; a crate with no block has said nothing, and counting that silence as unrecorded would put a claim in the record nobody made. The chart draws the difference as a band, so the three pre-115 weeks show a tree with 119 named things and no provenance rather than three empty bars, which this page's own rule would otherwise read as "no data".

The band found something the block did not predict. It survives two weeks past milestone 115 and is exactly seven names, all of them Cargo packages. Milestone 115 (the names ratified and refused) covered three surfaces and a package was not one; the package kind closed the hole on 2026-08-18, and this series reproduces the hole and its closing without being told about either.

And a bug, found by running the thing. script/metrics --backfill dropped the coverage_lines_pct cell, which the script's own comment calls the only copy of that measurement there will ever be: adding a column meant a rewrite, and a rewrite reset every row. Fixed in the same change, and the evidence the columns were added rather than the series altered is that all 34 existing columns are unchanged in all eight weeks and the seven existing SVGs are byte-identical.

The sixth column, and what it found. proposals_unnumbered is 74 at 2026W36 and zero in every week before, because the directory was created on 2026-09-04. One bar is a number rather than a series, so it gets no chart and a section of prose instead; the column exists so the series accumulates. Its parse is shared the same way (helpers/roadmap_proposals.py, also provisional), and script/roadmap's output is byte-identical on every mode.

The premise that it is a one-way queue is false, and the checking is the useful part. Five proposals have left the directory, so 86 have been written and 81 remain. One was promoted to a number the ordinary way (milestone 256, x86_64 places PCI BARs in a hardcoded window, and on xenon that window is RAM). The rest were done, by a lane that picked the file up and fixed the thing, twice filing a narrower proposal in its place. So the column is a NET count over a gross flow, and a flat line on it would be consistent with a stalled pile and equally consistent with one draining as fast as it fills.

The caveat is on the page, in its own subsection, because the BUGS entry below was right that it is the part most likely to be dropped. notes/project-metrics.md carries "A rising Provisional band is not debt" with AGENTS.md's worklist-not-a-wall quote under it, the reason a provisional name is the mechanism working rather than failing, and the note that the band worth an alarm is Unrecorded, which this chart has at zero.

Follow-on

Index row

calef, 2026-09-11. 101 of 205 names unratified and nothing shows whether that is climbing or falling, where milestones get seven status columns and decisions six. Five naming columns and a chart, plus proposals_unnumbered (scope added the same day). The series found seven packages carrying no provenance for two weeks, and a --backfill that dropped the coverage cell.