712. The install gates run nowhere, so rung 2a can rot without anybody hearing
Title and slug are drafts. Raised 2026-10-03 by the lane briefed to build milestone 198 (a package manager, and the trivial install) rung 2a. It found the rung already built and re-ran its gates instead (see the status section of milestone 515 (the installer: a stick that puts itself on the machine's disk and is then not needed)).
The finding
cargo xtask install-boot, rollback-boot and confirm-boot are the only proof that a nife stick
installs itself and that an installed disk survives a bad upgrade. No workflow, script/test leg
or script/verify row runs any of them (grep -rn install-boot .github script finds nothing). They
passed on 2026-10-03 at e613c520 because nothing between 2026-09-21 and that day broke them, not
because anything checked.
The reason recorded for leaving install-boot out of script/test's default legs was cost:
"The two boots take several minutes under TCG" (xtask/src/install.rs, BUGS). Measured on
patagonia on 2026-10-03, warm: 42.5 seconds wall for the whole gate, build included. The
comment is corrected in the same change as this proposal.
What the work is
Run the three gates on a schedule, not on every pull request: a nightly or weekly workflow in the
shape of stranger-cadence.yml, posting under nife-smelter[bot] when one fails. Per pull request
would add an x86_64 OVMF job to a CI that has already split one job for being slow (ci.yml,
beside milestone 628 (the x86_64 swish-check leg costs what the others do)). These gates also
guard a path few pull requests touch.
What it needs first is one CI measurement: the 42.5 seconds above is an Apple M-series host emulating x86_64, and the arm64 runner pool may be slower. The workflow's first run is that number.
BUGS
- A scheduled run finds a break up to a week late, and the culprit has to be bisected rather than read off the failing pull request. Accepted against the per-pull-request cost; revisit if a break is ever found that way.
Index row
Nothing runs the three install gates on any schedule, and the cost recorded as the reason (several minutes) measured 42.5 seconds warm on 2026-10-03; a scheduled workflow is the proposed fix.