roadmap NOT-STARTED

782. Measure the reach of the glob proofs

Raised by the risk-2 reach study (lane/kani-reach, milestone 741 (does a standing proof notice a regression)) on 2026-10-04 (UTC). Title and slug are drafts.

The study measured 189 harnesses and skipped glob's 6 on cost. With --reached-only they were estimated at 53 Kani CPU-hours, against 29 for the other packages combined. The estimate came within 6% of elf's measured cost. glob's proofs are the slowest in script/verify's table (902 s), so they are also where a weak proof costs the most to keep.

Done when

Index row

The reach study skipped glob's 6 harnesses on cost, and they are the slowest proofs in the verify table. Measuring them at bounded parallelism completes the study and shows where the most expensive weak proofs would be.