roadmap BUILT

840. The scheduler file is split along its seams

(The title and slug are provisional.)

kernel/src/sched.rs is 8,921 lines at ea7a58d. Milestone 41 (dead-code triage) measured it at 3,166. Its header says "a round-robin scheduler, and the preemption that makes it mean something", and that is about a quarter of it. The rest is everything that takes the IPC_TABLES lock. Milestone 98 (the scheduler that stopped scheduling: name what SCHED actually guards) already found this for the lock; this milestone does the same for the file.

The boundaries were an architect's call. calef ruled them on 2026-10-11 (UTC): "Accept all four sched split recommendations." §271 (the scheduler file splits into submodules of sched) records the four answers: submodules, capability deletion stays, region reaping alone, and the size target in Done when below. Every module name still ships provisional. The lane waits on milestone 812 (std::thread::spawn runs real threads in one address space), which reshapes this file and already cut sched/configure.rs, sched/futex.rs and sched/process.rs as submodules beside sched.rs.

Reuse: not applicable; this moves code and adds none. The precedent is kernel/src/user.rs beside kernel/src/user/, where each service grew its own file.

What is in the file

Measured on ea7a58d from the file's own top-level items. Line ranges are approximate at the edges, where a doc comment belongs to the item below it.

lines count what
1 to 923 923 header, per-CPU current thread and capabilities, the thread table, IpcTables
924 to 1166 243 mod trace, twice
1167 to 1337 171 soak-test counters, boot stage
1338 to 1547 210 mod canary, twice, and its two wrappers
1548 to 2884 1,337 init, spawn, placement, stealing, idle, exit and fault, the tick, schedule, finish_switch
2885 to 2975 91 interrupt routes: bind_irq, irq_route, irq_notify
2976 to 3105 130 rendezvous creation
3106 to 3471 366 notifications, including binding one to a thread
3472 to 3639 168 timers
3640 to 3766 127 wake placement and wake
3767 to 4737 971 send, receive, call and reply, capability transfer, stranding callers
4738 to 4960 223 deleting page-frame, device-frame and port-range capabilities
4961 to 5130 170 the current thread's capability lookup, grant, delegation
5131 to 5178 48 creating a thread control block
5179 to 5818 640 region reaping, reclaim_region, supervised reap and survey
5819 to 6199 381 configuring and starting a thread control block, binders
6200 to 6831 632 accessors, most of them hooks for system_tests
6832 to 8921 2,090 mod tests, 33 #[test_case] functions

mod trace (:925 and :1115) and mod canary (:1349 and :1507) each appear twice. Each pair is a real module under cfg(not(feature = "bench")) and its no-op twin under cfg(feature = "bench"), written so call sites need no cfg of their own. They are cfg variants, not duplicates, and each pair moves as one.

The brief this was filed from listed IPC rendezvous, notification binding, timers, capability grants, device-frame capability deletion and region reaping. All six are here. It left out SMP placement and stealing, interrupt routing, thread-control-block construction, the supervision survey and the test hooks.

A proposed cut

Every name here is provisional. ipc is not available: §154 (the acronym test is whether the phrase is spoken, applied recursively) deratified it.

module, provisional from the table about
sched (sched/mod.rs) 1 to 923, 1548 to 2884, 3640 to 3766, boot stage 2,400
sched::trace 924 to 1166 240
sched::canary 1338 to 1547 210
sched::rendezvous 2976 to 3105, 3767 to 4737 1,100
sched::notification 3106 to 3471 370
sched::timer 3472 to 3639 170
sched::interrupt_route 2885 to 2975 90
sched::capability 4738 to 5130 390
sched::thread_control_block 5131 to 5178, 5819 to 6199 430
sched::region_reaping 5179 to 5818 640
sched::inspection 6200 to 6831, soak counters 800

Tests move beside the code they test, each module growing its own mod tests.

What an architect had to rule

Answered 2026-10-11 (UTC) in §271: the recommendation on each of 1 to 3 was accepted, and 4 ships provisional. The questions stay here as they were asked.

  1. Submodules of sched, or siblings of it. Milestone 98's argument points at siblings: a rendezvous is not scheduling. The recommendation is submodules. Every seam above takes &mut IpcTables under one lock (76 IPC_TABLES.lock() sites), so as siblings the table's fields become pub(crate) and the whole kernel can reach them. As submodules they stay pub(super). That reason holds at equal cost, so this is not a recommendation about effort.
  2. Whether capability deletion belongs in sched at all. kernel/src/revoke.rs is its largest caller after system_call.rs and a candidate home. It stays in sched here because it walks every thread's capability table under the scheduler's lock.
  3. Whether region reaping belongs with thread control blocks or alone.
  4. Every module name in the second table.

If the answer to 1 is siblings, the cut is the same and only the paths change. If it is "do not split", the file keeps growing at its current rate and nothing else breaks.

What it is not

A file split, not a lock split. IPC_TABLES stays one lock at one rank and no function changes behavior. Splitting the lock is a design change with a lock-order argument behind it, and not this milestone.

What moving the code breaks

These were found with grep, and a lane has to carry each one.

Done when

  1. kernel/src/sched.rs, the parent (812's layout keeps it beside kernel/src/sched/ rather than as sched/mod.rs), is under 3,000 lines, and no new file is over 1,500 (§271, part 4).
  2. Every pub path callers use today still resolves, through pub use where needed, so no Rust file outside sched changes. The tooling, patches and citations listed above are the exception.
  3. script/test passes on aarch64, riscv64 and x86_64 with no test body changed.
  4. script/fastpath-footprint and script/icount are unchanged, or each difference is explained. script/bench floors hold.
  5. All 16 falsification patches apply and fail their tests.
  6. Each new module carries a //! Name: block marked provisional.

What was built

Built 2026-10-11 (UTC) on ddd38f0b0, the merge of milestone 812. kernel/src/sched.rs went from 8,888 lines to 1,889, under the ceiling of §266 (a Rust source file stays under 2,000 lines), so its file-length row is gone. Every name below is provisional.

file lines holds
sched.rs 1,889 IpcTables, init, spawn, exit and fault, the tick, schedule, finish_switch, wake
sched/tests.rs 1,219 the scheduling tests and the wait helpers the others share
sched/rendezvous.rs 1,109 creation, send, receive, call, reply, capability transfer, stranding
sched/rendezvous/tests.rs 717 the rendezvous tests
sched/region_reaping.rs 831 the reap verdict, reclaim_region, supervised reap and survey, with their tests
sched/inspection.rs 826 soak counters, boot stage, preemption counts, accessors, system_tests hooks
sched/capabilities.rs 427 lookup, grant, delegation, and the deleters (§271 part 2)
sched/thread_table.rs 406 Threads, the peak and per-slot tick accounting
sched/notification.rs 387 notifications and binding
sched/placement.rs 324 spawn placement, idle, inboxes, stealing, wake targets
sched/thread_control_block.rs 292 creating, inserting into and starting a thread control block, binders
sched/trace.rs, sched/canary.rs 183, 153 the real modules; each bench twin stays inline beside its mod line
sched/timer.rs 173 timers
sched/interrupt_route.rs 102 interrupt routes

capability was the planned name, but a module of that name shadows the capability crate inside sched, so the child is capabilities. Each child takes use super::* and the parent re-exports each whole, so no path outside sched changed and no test body changed. Private items became pub(super).

Measured against ddd38f0b0. script/icount reads identically on both ISAs and script/bench --check passes on all three. script/fastpath-footprint moves at most 12 bytes on aarch64 and x86_64. On riscv64, riscv_trap_dispatch now inlines preempt_if_needed (146 to 360 bytes), so system_call_entry grew 11% while the executed code stayed the same. That baseline was re-recorded with the reason. The 18 falsification records that patched sched.rs were regenerated at the lines' new homes, and the sweep shows each one still turns its test red.

Follow-on

Index row

kernel/src/sched.rs grew from 3,166 lines to 8,921, and three quarters of it is rendezvous, notifications, timers, capability deletion, region reaping and test hooks rather than scheduling. This splits it into submodules of sched under one unchanged lock, as §271 rules. Every module name is provisional.