205. The subscription stays, and rented models fill the mechanical tail
calef, 2026-09-22. (Number provisional until the merge queue lands it.) He had proposed downgrading Max 20x to Max 5x, freeing $100 a month for open-weight models, and cancelled that after the numbers came in. Max 20x renews.
What was actually proposed, and why it failed
The plan was symmetric and wrong in one term: drop 75% of Claude capacity, replace it with rented open-weight capacity at a fraction of the price. §202 (mechanical work goes to a cheaper model) had ruled the routing and §203 (capacity is rented rather than bought) had ruled the sourcing, so this looked like execution rather than a new decision.
calef found the flaw before the maintainer did, in one sentence: "30% offload doesn't seem like enough if we're bumping up against 20X and downgrading to 5X. It seems like we need to offload 75%."
The measurements that settled it, all taken 2026-09-22
The infrastructure works and is not the constraint. An Anthropic-format gateway runs on cordoba (notes/open-model-lanes.md), and three real lanes completed on open-weight models with every gate green. What decided the question was price per kind of work:
| lane | model | cost |
|---|---|---|
| renumber two milestone files, pure mechanics | Qwen3-Coder | $0.048 |
| the same, for comparison | Kimi K3, uncached | $0.393 |
| the same, preference-pinned so the cache warms | Kimi K3 | $0.258 |
| milestone 570 (the install offer should say what is already on the disk), a real implementation | Qwen3-Coder | $0.98 |
The twentyfold gap between the first and last rows is the finding. A mechanical lane is five cents; a real implementation lane is about a dollar. Twenty implementation lanes a day is $600 a month, three times the subscription it would replace, and Max 20x supports roughly 100 to 140 lanes a month, which is $1.50 to $2 a lane. So renting is modestly cheaper than the subscription for implementation and dramatically cheaper only for the mechanical tail.
Against that, the offloadable share measured about 30% of lanes, and those are also the cheap lanes in tokens: the promotion repair took 125k and the falsification refresh 169k, against 549k for the installer and 344k for rung 2b. So the tail is roughly 18% of a day's tokens.
18% offloaded cannot fund a 75% cut. That is the whole arithmetic.
What is decided
- Max 20x renews. The binding constraint is a rate limit rather than a bill (§203), and downgrading tightens exactly the thing that hurts.
- The mechanical tail moves off Claude anyway, because it is nearly free. ~180 lanes a month at $0.048 is about $9. That is a 4.5% spend increase that returns roughly 18% of Claude capacity, or three to four more judgment lanes a day.
- Maintainer work is the next candidate and is unmeasured. Queue nannying, CI-log triage and rebase conflict resolution are mechanical, are done in the most expensive context available, and plausibly exceed the 18% above. The first delegated rebase ran on 2026-09-22.
BUGS
- The redo rate is unmeasured, and it is the number most likely to invert this. A lane that passes every gate and must be redone on Claude costs more than never having offloaded. Three open-model lanes have passed their gates; two carried editorial defects a gate cannot see (one dropped a load-bearing sentence, one conflated "unpartitioned" with "unreadable" in a prompt whose purpose is informed consent). Neither required a redo, but neither was clean.
- The maintainer's own consumption is still not instrumented. Every share above is a count of lanes or of subagent-reported tokens; the session's own use is invisible, which is what milestone 553 (what a lane spent on its milestone) exists to fix and has not.
- All prices are one day's observation on one provider, with one model per row and no repeats. A second run of the same lane could move any of them.
The one-time reset was spent on 2026-09-23, and the insurance is gone
calef pulled the manual limit reset that night, restoring capacity until Friday's weekly roll. He had one available before 2026-10-22 and now has none.
He spent it on the criterion this section's own conversation set. That is worth recording because it is the difference between a decision and a reaction. The maintainer recommended holding it until the routing work landed, and named the single case for spending early as hitting the weekly wall mid-build, where the alternative is idling until the window rolls. That was the case. The projection was running out by the following morning.
What it lifted, and what it did not, because these are easy to conflate and only the first is about money:
- Tokens: lifted, to Friday.
- Memory: unchanged. A Kani harness still reaches about 3.5 GB against this machine's 16 GB, so one solver at a time holds whatever the budget says.
- CI runners: unchanged, and binding that night. Two pull requests carrying 44 and 21 new falsification records sat behind 35 queued runs org-wide. More tokens buys more lanes that queue behind the same runners.
So the reset bought authoring capacity, not verification capacity, and the night's work was stacked on the second.
The routing work is now more urgent, not less. This section priced an open-model tail and the
maintainer proposed batch variants at roughly half price and an effort lever. Neither landed.
notes/effort-levels.md measured effort as a null result on the task it tested: prompt wording
explained all of the correctness and the level explained none. Batch pricing was raised three times
and never applied to a single lane.
There is no second reset behind the next wall. That is the whole of what changed.