Milestones built and pull requests merged each week
Name: ratified 2026-10-18 (calef, convention-rulings Rule 3).
An appendix to the register of measures.
Milestones built each week
This is the only flow in the deck. Every other milestone number there is a stock: what the tree
holds at a revision. This one is what happened in those seven days, so it answers "how fast". It was
added on 2026-09-20 at calef's request. He asked for it per day first, then per week, which is the
same number over seven and matches the cadence of every other series in notes/project-metrics.md.
What it is counted from
It counts the index's Built column, one row per milestone. REMOVED rows count too, because
removal does not unbuild anything. script/roadmap's own rule is that a milestone built on a date
turned BUILT on that date, and nothing later makes that untrue.
Why every week is read from today's tree
This breaks the register's usual rule. Computing each week from its own revision was tried first,
and it is wrong. The index was generated by milestone 294 (design/roadmap/README.md's index is
generated) and regenerated at an integrator's convenience. So a week whose revision predates its own
regeneration reports zero, and a later week reports both. Backfilled that way on 2026-09-20, it gave
0 for 2026W29, 2026W30, 2026W31 and 2026W33, against 10, 8, 20 and 9 actually built in those weeks.
A stock read late is merely stale. A flow read late lands in the wrong bucket, and still looks like history. A BUILT date is a stable fact, so reading them all from one tree is the only way to get it right. The cost is real: this column alone changes for a past week if somebody corrects that week's date. Correcting it is what we would want.
What the height does not mean
A milestone is not a fixed unit, and this chart cannot fix that. At one end is milestone 164 (x86_64
userspace can't build aes), one build flag that turned exit 101 into exit 0. At the other is a
three-architecture bring-up. Read the shape, not the height. AGENTS.md says the same of its own
count: take it as scale, never as a claim about correctness.
Some weeks also carry bookkeeping. An integrator may promote proposals to milestones, or backfill
refusals as their own blocks, moving rows into the roadmap that nobody built. Those land as
NOT-STARTED and REFUSED rather than BUILT, so they stay out of this chart. That is why it counts
dated rows instead of differencing last week's BUILT total against this one. A difference would be
wrong in both directions, and quietly. A PARTIAL block that turns BUILT was already counted as a
milestone. A block that turns SUPERSEDED leaves the BUILT column without anything being unbuilt.
2026-09-23: this chart does not reconcile with the Built stock, and that is the design
calef read the effort chart in project cost and asked which milestones made up
2026W35's denominator of 8. Diffing the Built total between that week's row and the previous one
gives 6. So does diffing **Status:** across every roadmap block between those two rows' own commits.
Three numbers give two answers, and the larger one flatters the project. A denominator of 8 prices
2026W35 at about 1,021 million tokens per milestone; 6 prices it at about 1,362.
All three are right, and the column is the one to trust. The two sixes are one measurement taken two ways: both ask what the roadmap said at two moments a week apart. The column asks what was built, from the dates the roadmap carries today. They differ by the lag between finishing a milestone and flipping its row, and that lag is not small here:
| week | built that week | Built stock |
stock change | counted here, recorded later |
|---|---|---|---|---|
| 2026W29 | 10 | 0 | 2, 3, 4, 5, 6, 7, 8, 9, 10, 11 | |
| 2026W30 | 8 | 0 | 0 | 12, 13, 14, 15, 18, 19, 21, 26 |
| 2026W31 | 21 | 26 | +26 | 50, 69, 70 |
| 2026W32 | 31 | 63 | +37 | 58, 65, 67, 104, 107, 112, 115 |
| 2026W33 | 9 | 73 | +10 | 80, 93, 125 |
| 2026W34 | 18 | 97 | +24 | 344 |
| 2026W35 | 8 | 103 | +6 | 191, 193 |
| 2026W36 | 49 | 150 | +47 | 375, 380 |
| 2026W37 | 13 | 160 | +10 | 281, 285, 286, 287 |
| 2026W38 | 64 | 228 | +68 | 434, 447, 518 |
| 2026W39 | 16 | 246 | +18 | 512 |
All eleven weeks disagree, and not one disagreement is a milestone this chart invented. Every number in the last column turns up in a later week's stock change, and that is the whole of the gap.
2026W35's two show the shape in miniature. Milestone 193 (put kernel/src within reach of the
prover) was flipped on 2026-08-30, after the week's index regeneration, so the stock records it in
2026W36. Milestone 191 (did the proofs catch the bugs? a retrospective of every real defect) was
flipped on 2026-09-11. The commit's subject says so: "has been BUILT since 2026-08-30 and nothing
noticed". The stock records it in 2026W37, twelve days after the work.
2026W29's ten are the extreme case. Milestones 1 to 11 were backfilled as blocks weeks after the kernel they describe booted. A stock difference therefore puts the project's entire first fortnight in 2026W31 and 2026W32.
The totals agree
The tree holds 247 BUILT plus 3 REMOVED blocks. One of the three carries no **Built:** date,
because it was removed before it was built: milestone 55 (Time Machine: SMB3 with Apple's
extensions, and mDNS). That leaves 249 dated blocks, and bucketing them by week accounts for all 249.
There are 247 in the table and one before the series starts. The last was dated into 2026W39 after
that row was written; the current week is still open and is rewritten on every run. The weekly
buckets differ from the stock; the population does not.
One milestone falls off the left edge, and script/metrics now says so
Milestone 1 (boot to Rust on QEMU virt, and print to the PL011 UART) is dated 2026-07-12, a Sunday.
That is 2026W28, and the series starts at 2026W29 because that is where the first commit is. It is
dropped rather than absorbed into the neighboring week. The $200 of subscription in the same week is
dropped for the same reason. A week gets a row only if a commit fell in it, and inventing one would
leave every other column in it empty or wrong. The drop prints a stderr warning, as the cash column does for its identical case.
Nothing published changes
The column was checked against the blocks and reproduces exactly. The stock column reproduces
exactly at all eleven of its own commits. Every other column was checked for the gap that left
unsafe_trust_* blank for ten weeks (a --update where a --backfill was needed). Only the cost
columns and coverage are blank anywhere, on purpose, as project cost explains.
milestones_built_this_week cannot take that damage. script/metrics writes it for every week in
the file on both --update and --backfill, never only for the added week.
The trailing ten-week mean
calef asked for it on 2026-09-24, first here and then on the pull-request chart, because a flow that
reads 8, 49, 13, 64 in consecutive weeks cannot be read for direction by eye. Both charts use one
helper, trailing_mean in script/metrics, so the two lines cannot be computed differently. It is
the mean of the week and the nine before it, reaching back past the chart's left edge into the CSV.
script/metrics draws it rather than storing it: a stored copy of arithmetic over a stored column
is a second place to be wrong.
The series starts at 2026W29, so the first full window is 2026W38. script/metrics draws the weeks
before that window dashed, with their own legend entry, rather than leaving them off. Starting
the line at the first full window would have given two points on a ten-bar chart, and the dashed
part is honest about what it is: a mean over fewer weeks, which swings harder. It leaves the chart
on its own as the window slides, and from 2026W47 every point shown is a full ten weeks.
Pull requests merged each week
This is the deck's second flow, and it exists because the first one undercounts. Milestones count
declared units of work. A large share of what lands on main is not one: a decision, a correction,
a record fix, a capture, a gate that was wrong about the tree. On 2026-09-21 the maintainer opened
about fifteen pull requests, of which three were milestones. Every column in the deck was blind to
the other twelve. calef asked for this series the same day, alongside the cost columns of milestone
519 (what this project costs, tracked where it cannot rot). That invisible work is most of what the
cost columns measure.
Counted from git, never from the GitHub API
That is why it backfills to the first commit like everything else in the deck. A merge commit carries
its own committer date, and main holds all 996 of them. Actions retains run history for ninety
days, so an API-derived series would have started in June and could never be extended backwards. The
shape matched is GitHub's default merge subject, Merge pull request #N from ..., which is what the
merge queue writes. A merge made any other way is not counted. After the fact, it cannot be told
apart from an ordinary merge commit.
Read it beside the velocity chart
The pairing is what is diagnostic. Many pull requests against few milestones means the week went into record-keeping or into churn (reverts, fix-ups, corrections). Those are very different weeks, and the deck cannot tell them apart. It can only make the question visible.
2026W29 and 2026W30 are genuine zeros. The first two weeks were commits straight to a branch with no pull request; the practice starts in 2026W31 with 8.
Commits are charted, and the reason not to chart them still holds
This section read "commits are deliberately not a series here" until 2026-09-24, and its argument
was not wrong. The count measures lane hygiene at least as much as output. AGENTS.md requires a lane
to commit whenever a piece works, because uncommitted work in a worktree is the one thing no part of
this system protects. It then requires the lane to squash the checkpoints into purposes before
reporting. So the number reflects how faithfully lanes did both. A week where lanes squashed well
looks less productive than one where they did not.
The caveat did not get weaker. What changed is that a commit count by model answers a question no other column in the deck can: who is doing the work. That is worth a chart even with a noisy unit under it. The chart is argued in which model wrote it, and it carries this warning rather than escaping it: read the shares, not the heights.
And a pull request is not a unit of value
Merging four small corrections is four pull requests, and it might be the best hour of the day or the worst. This series answers how much landed. The cost columns in project cost answer what it took. Neither answers whether it was worth doing, so do not read a rising line here as though one of them did.
The share that pays down debt
calef asked for it on 2026-10-11 (UTC). It is the share of each week's merged pull requests that
carry the debt-paydown label, whose definition and backfill are in
which pull requests pay down debt. The chart is debt-paydown.svg and the
columns are in debt-paydown.csv; all three names are provisional.
Counted from the GitHub API, unlike the series above
A label is on GitHub and not in git, so helpers/debt_paydown_share.py fetches every pull request
merged into main each day and rewrites merged-pull-requests.csv, one row each. The helper
fetches the whole history because a label can be corrected long after the merge, and a corrected
label should correct the past week. So a past week's share can move on any run.
Numerator and denominator both come from that file. The denominator is therefore not
merged_pull_requests, and the two differ by up to four in a week. Sixteen pull requests that
GitHub records as merged into main by 2026-10-11 have no default merge commit on the first-parent
line, mostly a merge queue fast-forward (#1516), so only this count sees them. A merge in the last
seconds of a Sunday can also fall in different weeks under mergedAt and the committer date.
Pull requests merged into another lane's branch are left out of both.
The line is pooled
The line is ten weeks of labeled pull requests over ten weeks of merged ones, not a mean of ten weekly shares, so a quiet week weighs only what it merged.