What this project costs

Name: ratified 2026-10-18 (calef, convention-rulings Rule 3).

An appendix to the register of measures.

Three units, and no fourth that adds them up

Milestone 519 (what this project costs, tracked where it cannot rot) refuses a single headline number. Three audiences want three different ones. The comparison against the verification literature wants person-weeks. The argument that the method is getting cheaper wants tokens with a dated price. calef's own budgeting wants cash. The columns are human_person_weeks, lane_tokens with lane_wall_clock_hours and price_per_mtok_at_date, and cash_spend.

The shape of the numbers

Cash to date is under a thousand dollars all in. Against it stand eleven person-weeks of one experienced engineer's full attention. Milestone 519's block says "about ten", written two days before this column existed. The column counts eleven calendar weeks, 2026W29 through the current partial 2026W39, so the difference is arithmetic rather than a correction. At any plausible rate for that person's time, the human cost is on the order of 99% of the economic cost and the machines are a rounding error. The honest claim is not that software became cheap. The scarce input is still a person; what changed is how much one person's attention can be made to carry.

The chart is a ratio: tokens per milestone

A total would say the project was busy. Millions of tokens per milestone built says whether the method got cheaper, which is the claim principle 2 of AGENTS.md makes. It fell from 307 in 2026W34 to 73 and 68 in 2026W36 and 2026W38. Four caveats come with it:

The deadline, and what was already gone when the capture started

Every other column in notes/project-metrics.md is computed from a git revision. History backfills by reading the tree at a past commit, which is how the mutation census, the velocity column and the coverage cells were filled in retroactively. Token and wall-clock records are not in git. They live in the agent harness's session records under ~/.claude/projects/, on one laptop, outside this repository, and nothing promises to keep them.

The first capture ran on 2026-09-21 and read 477 record streams. It found 2026W34 through 2026W39. It found nothing at all for 2026W29 through 2026W33, the first five weeks of the project, against a first commit on 2026-07-12. Those weeks are recorded as absent, not zero, in the CSV and on the chart. An absent week averaged in as a zero would be a false figure that ends up published.

2026W37 is captured but should be treated as suspect. It reads 12.2 machine-hours against 110 to 133 on either side, in a week whose roadmap says 13 milestones were built. Either that week really was quiet, or its records were rotated away before anyone looked. Nothing can tell those apart after the fact. That is the argument for the snapshot described in reading the weekly series, under How the series stays current.

What lane_wall_clock_hours is, and what it conflates

It is the sum, over every record stream, of the gap between consecutive responses. script/effort drops any gap longer than thirty minutes. A stream is one session or one subagent lane, so parallel lanes add. Four lanes working for an hour is four hours here, and a week can exceed 168. It is an effort figure, not an elapsed one.

It conflates queueing with work. A lane waiting on the merge queue, a gate or a rate limit looks the same here as one thinking. The thirty-minute cut is a judgment, not a measurement. A longer gap is a session left open overnight, and counting it would put a sleeping laptop in the total. IDLE_GAP_S=600 script/effort shows how much the choice moves.

Two dollars, and which one is which

Milestone 519 is sharpest about this refusal. This project pays a fixed monthly subscription, so the marginal cost of one more lane is zero dollars. cash_spend is what was actually paid: $200 a month since 2026-07-12, plus $271.81 of hardware on 2026-08-15.

price_per_mtok_at_date is a shadow price, and it is a rate rather than a total on purpose. It is that week's own token mix priced at vendor list rates. A reader who wants the shadow figure multiplies it by lane_tokens and knows exactly what they have multiplied. Quoting one of these two numbers while implying the other is dishonest, so neither appears without its label. Both rates and purchases live in nifeos/nife:notes/project-metrics/ledger.md, which is appended to by hand and never regenerated.

The blended rate moves with the mix, not only with prices. It runs from $0.30 to $0.78 per million tokens across the captured weeks, while no published price changed. This tree's work divides roughly half and half between claude-opus-5 and claude-sonnet-5 by token. A cache read also lists at a tenth of an input token, so a week that cached well reads cheap.

$200 of real spend is outside this series, and that is not rounding. calef dates the subscription 2026-07-12, a Sunday, which is 2026W28. The first commit is 2026-07-13 UTC and the series starts at 2026W29. A week gets a row only when a commit fell in it, so cash_spend sums to $671.81 against $871.81 actually paid. script/metrics prints the discrepancy on every run rather than folding it into a neighboring week.

human_person_weeks is a statement, and will stay one

It is 1.0 per calendar week, because calef works on nife full time. It is not a measurement. Nothing will make it one without time tracking, and milestone 519 refuses that: a person required to log hours stops volunteering the honest ones, and the metric is then worth less than what it displaced. The only thing ever asked of him is a correction when the datum stops being true. The column is carried through every rewrite, so a hand-edited week survives the next backfill. It is accurate to the bucket the comparisons need and no better: seL4 at about eleven person-years plus nine more for the proof, and Atmosphere at 1.5 person-years on verification.

What a turn costs

A turn costs roughly the size of its context, not the size of its thought. This was measured on 2026-09-24 across every session record this machine holds. Cache reads are about 98% of all tokens spent. Cache creation is about 1%, uncached input effectively 0%, and output about 0.1%. The mean prompt per request runs between 230,000 and 359,000 tokens across the captured weeks. The largest single request in every one of those weeks sits between 933,000 and 1,000,000, against a 1M window.

This does not claim that 98% is waste. Carrying context is what makes a long session coherent. It is why a lane can be told a hazard once, and why a maintainer can resolve a conflict without re-reading the tree. It is also why the method in AGENTS.md principle 2 works at all. The finding is about where the bill goes, not whether the spending buys anything. It does say the first lever people reach for is the wrong one: a cheaper model prices the output, and output is a tenth of one per cent of the tokens.

The columns are flows and a peak, never a stock. lane_turns, lane_cache_read_share_pct and lane_context_per_turn_mean are per-week events over that week's requests. lane_context_per_turn_peak is the largest single request in the week. It is a maximum rather than a sum, so adding two of them would invent a request nobody made. The deck has already paid for confusing the two. Landed each week records the same distinction under "this chart does not reconcile with the Built stock, and that is the design". It was found on 2026-09-23 by diffing a snapshot between two rows and getting a different answer from the flow. The rule is cited here, not re-argued.

Why the mean is charted, and what happened to the median and the peak

Peak is measured and not drawn, because it saturates. Every captured week peaks within 7% of the model's 1M context window. So the peak answers one question, "did a session run to the wall this week", and the answer is yes, every week. That is one bit, and a chart of it would be a flat line read as a trend. It stays in notes/project-metrics/context-per-turn.csv and in effort.csv, where a week that fell well short would show up as news.

Median was refused because of the instrument, not taste. script/effort survives a pruned transcript by merging every column as a maximum against an older machine-local snapshot. That works because a sum and a peak both only go up as script/effort sees more of a week. A median does not combine that way. Two honest partial views of a week cannot produce its median without the per-request numbers underneath, and those are what gets discarded. Storing a median would mean keeping a per-request history, a much larger promise than this measurement has earned.

So the mean is the series. It is arithmetic over columns the file already carries: input plus cache write plus cache read, over requests. That is why it is derived at write time rather than stored twice.

This panel is the checkpoint, by design

calef asked on 2026-09-24: "How do we set a checkpoint to re-evaluate that will not be forgotten?" The question was about a decision deliberately deferred: whether to impose a session length limit on the agent harness, and at what threshold. No threshold has been set. AGENTS.md's measure first, then decide is the reason. A threshold chosen before the data exists is no better than one chosen under attachment, and one measurement is not a distribution.

A checkpoint in a calendar reminder or a conversation is in the medium this project keeps abolishing. This panel is the mechanism instead. Nobody has to remember to look, because the number arrives in front of whoever reads the deck (notes/project-metrics.md). Each week it moves or it does not. A reader who has never heard of the deferred decision still sees the quantity it depends on.

The decision itself has a home with a trigger, in design/roadmap/proposals/. The trigger is enough weeks to show a distribution, judged by reading these bars, not a week count. A count would be the same threshold chosen in ignorance that the tenet refuses.

This instrument has the same deadline as the cost columns above

This is stated here as well as in the proposal, because a reader meets the number here.

Known limitations

These moved here from notes/project-metrics.md's BUGS on 2026-09-24, when that page passed its 3,000-word budget; they describe the columns this appendix argues, so this is where a reader of them arrives.