Reading the weekly series
Name: ratified 2026-10-18 (calef, convention-rulings Rule 3).
An appendix to the register of measures.
The weekly series: the arguments behind each column
notes/project-metrics.md became a deck on 2026-09-24 (calef: "we've packed a lot of text into
notes/project-metrics.md, but I really envision more of a deck... I think we should start clean and
build"). A chart there is a heading, an image, and at most a line or two. Caveats that will not fit
on one line needed a home, and the register is it. Most of them are what keeps an honest chart from
becoming a misleading one, so none was deleted.
The division of labor
A caveat that prevents misreading a chart stays in the deck, compressed to one line under that chart. Definitions, the arguments behind a measure, capture deadlines, reconciliations and dated analyses come to the register. The deck links to the register once, not once per section.
In the passages below, "the deck" means the weekly series and its charts on
notes/project-metrics.md. The arguments were moved from notes/project-metrics.md on 2026-09-24
and condensed the same day; git history holds the verbatim text.
Read this before you read a number
Every row is a restatement, not a report
script/metrics regenerates the series by applying today's definitions to old commits. That is
right for a trend, because a series measured seven different ways is not a series. It is also not
what was reported at the time, and the gap is not hypothetical. On 2026-09-02 alone, three of this
project's own instruments turned out to have been wrong:
- Milestone 214 (a test that prints "skipping" and returns is counted as passed) found 80 sites
doing exactly that. Twenty-five tests left the pass column on
x86_64once they told the truth. - Milestone 212 (
script/falsificationswalkscrates/only, so the ratio it prints is not the tree's) found the falsification denominator excluding the kernel anduser/. - DECISIONS ยง139 (who may read the cycle counter, and by what authority) corrected a figure that had conflated a counter's tick resolution with the cost of reading it.
So read a bar as what the tree would say today about how it looked then. The distance between that and what anybody believed at the time is real.
Every figure is derived by an agent, including these
There has been no external audit of any of it. This is a project measuring itself with instruments it wrote. That argues for watching the numbers move, but the deck is not an independent account. Where a number has been checked two different ways, the text says so and names the method. Everywhere else it has been recorded twice by the same method, which is consistency and not validation.
A missing bar means the record did not exist, not that the number was zero
Each of these arrived on a date, with nothing to restate before it: the roadmap, the decision
statuses, the falsification records, design/fatal-risks/README.md, the naming provenance blocks and
design/roadmap/proposals/. The two newest series show it most sharply. Names have three empty
weeks, because the convention that records a ratification was invented on 2026-08-04. Proposals
have seven, because the directory was created on 2026-09-04. Neither is backfilled, and each
section says so where its bars are.
Weeks are ISO weeks in UTC
That is this tree's date convention. The first commits are stamped 2026-07-12 in the architect's local time and fall on the Monday in UTC. So the series starts at 2026W29, and there is no 2026W28.
The charts show the ten most recent weeks; the CSV keeps every one
This was calef's call on 2026-09-19. So 2026W29 leaves the charts when 2026W39 arrives, and stays in its measure's CSV. That CSV is also the table view the charts rely on for the three colors that sit under 3:1 on a white page. A week is never deleted, only no longer drawn.
A week is spelled 2026W36, everywhere
The chart axis, the CSV's week column, script/metrics' own output and the deck's prose all use
it. calef ratified that on 2026-09-02. The page had been carrying three spellings at once:
2026-W30 in the narrative, 202636 on an axis, and 2026-W29 in the data.
It is ISO 8601's designation with the hyphen dropped. It still sorts lexically, and it cannot be
misread as an ordinary number the way a bare 202636 can. It is also the dictionary key that makes
rerunning script/metrics replace a row rather than add one. The axis label is that key, not
something derived beside it, so the two cannot drift apart.
How the series stays current
script/metrics --update recomputes the current week's row and redraws the charts. It also
restates any past week whose row is not at that week's last commit, so the first run after a week
ends closes it with whatever merged after the previous run.
.github/workflows/metrics.yml runs it daily (calef asked for this on 2026-09-23). It opens or
refreshes a pull request if anything changed, following toolchain-bump.yml, the closest existing
shape.
Coverage stays weekly, taken on Monday only. It needs a build, and a daily build would be seven
script/coverage runs for a column nobody reads more than once a week. (The interface series,
milestone 610 (the interface's stability is measured weekly), also builds, with cargo doc, and
runs daily because two week-end trees cost seconds; its cells are carried the same way.) So
script/metrics carries the cell forward on the other days rather than recomputing it. The row is
keyed by ISO week regardless: the daily runs update the current week's row in place and add no
rows between Mondays.
The data is one CSV per measure, in the tree and versioned with the code it describes. So the deck renders the repository's own numbers rather than holding a copy that can rot. A measure's file carries only the weeks it has something to say about. A series that began in 2026W39 starts there rather than trailing ten blank cells.
One column the scheduled run cannot produce, and what stands in for it
The workflow runs daily on a GitHub runner with a fresh checkout. It cannot see the session records
the cost columns are measured from, and no workflow ever will: those records live under
~/.claude/projects/ on the machine the lanes ran on. So a person captures machine effort by
running script/effort --update on that machine and committing the result. That is rung four of
AGENTS.md's ladder, and rung four is where this tree's failures live.
Two mechanisms stand behind it, because it can die in two different ways:
script/effort --snapshotmakes forgetting survivable. It reads the same records and writes the week's aggregate to a machine-local cache outside the repository. It touches no file in the tree, so it is safe to run unattended while lanes are working. A week's numbers then outlive the transcripts they came from, and a month of nobody committing costs nothing. It runs underlaunchdbeside the merge drain and the trunk watcher (notes/merge-queue.mdhas the plist shape).ProgramArgumentsis/bin/sh -c 'cd <checkout> && script/effort --snapshot', and aStartIntervalof 21600 (four times a day) is ample for a weekly figure.script/cadence-checksays when the capture has not happened. It asks whether the committednotes/project-metrics/effort.csvholds the current week.helpers/trunk-health.shalready calls it every five minutes on patagonia, the same machine that holds the records. It is the only row in that report that is not a workflow. There is no run history to interrogate, so the output is checked instead of the run.
Neither of them invents a number. A week that nobody captured stays absent, and the chart draws it as absent. This tree has twelve recorded instances of a missing failure signal being read as a pass, and a cost series that quietly stopped updating would be the thirteenth.
--update refuses to lower a figure a past week already carries, and says which week and column it
refused. That is the failure this measurement actually has: transcripts get pruned, a later run sees
less, and the smaller number overwrites the larger one without comment.
Idempotence
It is idempotent by how the file is written, not by a check on top. The CSV is never appended to.
It is read into a dictionary keyed by ISO week, and the week being written replaces its own entry.
The whole file is then rewritten from that dictionary, in sorted week order with a fixed column
order. So running it twice in one week produces the same bytes, and so does a backfill against a
history that has not moved. script/metrics --check is exactly "run it into memory and compare",
which is why it can be trusted to say whether the tree is current.
The representative commit for a week is the first-parent commit with the greatest committer date
inside it. First-parent, because that is the trunk a reader means by "the tree on that date".
Committer date, because a merge's author date can be days old and would file the merge under the
week its branch was cut. For a past week that answer never changes, which is the other half of the
idempotence. For the current week it is HEAD, and the row moves as work lands.
A dated reading kept for the record: two days of movement in 2026W39
The 2026W39 row was last computed 2026-09-21, the morning the scheduled workflow's Monday run
merged it (.github/workflows/metrics.yml, 0 6 * * 1). That was the automation working as
designed at the time: the workflow then ran on Mondays and has run daily since (0 6 * * *). The row was refreshed weekly on purpose, so it would not open the same near-empty pull
request six times in a row for a quiet week. The two days since were not quiet. So
script/metrics --update was run by hand on 2026-09-23 to catch the row up mid-week, the mechanism
already documented for this case.
The biggest mover is merged_pull_requests: 17 to 108, all verified against git log --first-parent for the same range.
milestones_built_this_weekwent 2 to 16.milestones_totalwent 521 to 566 (milestones_built232 to 246,milestones_not_started198 to 226). The backlog again grew faster than it drained.fatal_risks_testedwent 5 to 9 andfatal_risks_untested4 to 0: all nine risks indesign/fatal-risks/README.mdhad a status line on record. Later the same day those two columns were replaced byfatal_risks_run,fatal_risks_not_runandfatal_risks_cannot_run. The reason is in "The nine things that would kill nife" in records-by-status.md: a pair that reads nine and zero is a flat line.names_totalmoved 234 to 244 (names_provisional53 to 61) anddecisions_total203 to 207.proposals_unnumberedfell 17 to 2, most of that pile promoted or resolved rather than abandoned.
unsafe_trust_unclassified reappeared, 0 to 16. This is a data gap, not an instrument change.
helpers/rust_source.py was not touched in this window, but its hand-maintained crate tables were.
Four crates/ directories landed in those two days that none of KERNEL_ONLY_CRATES,
USERSPACE_ONLY_CRATES, SHARED_CRATES or BOOT_CHAIN_CRATES know about yet: boot_slot,
current_cpu_contract, file_allocation_table and top. current_cpu_contract carries the unsafe
blocks; the other three carry none. "The same unsafe blocks, by trust boundary" in
unsafe-series.md already names this limitation of a table read once and baked
in. unsafe_trust_boot_chain also moved, 37 to 62, and that is real growth in
uefi_loader/sealed_pair, not a classification artifact.
The token and cost columns did not move, deliberately. lane_tokens, lane_wall_clock_hours,
price_per_mtok_at_date and cash_spend for 2026W39 are byte-identical to the 2026-09-21 row:
506,140,600 tokens, 12.0 hours, $0.439/Mtok, $0.00 cash. notes/project-metrics/effort.csv was not
recaptured. The only way to recapture it was to run script/effort from the same session, which
would fold that session's own token consumption into the week it was reporting.
So the effort chart's "million tokens per milestone" line for 2026W39 fell from 253.1 to 31.6 in
this redraw. All of that fall is milestones_built_this_week growing from 2 to 16 under an unmoved
numerator, not tokens getting cheaper. It remains the most understated cell in the deck, now more
so, because two of the week's busiest days are not in the capture. coverage_lines_pct for 2026W39
is still empty, as it was on 2026-09-21: nothing here re-derives coverage, and this update did not
run script/coverage.
One earlier week moved too, by the mechanism already documented. 2026W31's
milestones_built_this_week went from 20 to 21. script/metrics reads that column from today's
tree for every week, on purpose (see "Milestones built each week" in
landed-each-week.md). So a BUILT date discovered since the last run can still
move a week that closed seven weeks ago. 2026W38's effort ratio moved from 67.8 to 65.7 for the
same reason: its milestones_built_this_week corrected from 62 to 64.