The weekly series: the arguments behind each column

notes/project-metrics.md became a deck on 2026-09-24 (calef: "we've packed a lot of text into notes/project-metrics.md, but I really envision more of a deck... I think we should start clean and build"). A chart there is a heading, an image, and at most a line or two. Caveats that will not fit on one line needed a home, and the register is it. Most of them are what keeps an honest chart from becoming a misleading one, so none was deleted.

The division of labor

A caveat that prevents misreading a chart stays in the deck, compressed to one line under that chart. Definitions, the arguments behind a measure, capture deadlines, reconciliations and dated analyses come to the register. The deck links to the register once, not once per section.

In the passages below, "the deck" means the weekly series and its charts on notes/project-metrics.md. The arguments were moved from notes/project-metrics.md on 2026-09-24 and condensed the same day; git history holds the verbatim text.

Read this before you read a number

Every row is a restatement, not a report

script/metrics regenerates the series by applying today's definitions to old commits. That is right for a trend, because a series measured seven different ways is not a series. It is also not what was reported at the time, and the gap is not hypothetical. On 2026-09-02 alone, three of this project's own instruments turned out to have been wrong:

So read a bar as what the tree would say today about how it looked then. The distance between that and what anybody believed at the time is real.

Every figure is derived by an agent, including these

There has been no external audit of any of it. This is a project measuring itself with instruments it wrote. That argues for watching the numbers move, but the deck is not an independent account. Where a number has been checked two different ways, the text says so and names the method. Everywhere else it has been recorded twice by the same method, which is consistency and not validation.

A missing bar means the record did not exist, not that the number was zero

Each of these arrived on a date, with nothing to restate before it: the roadmap, the decision statuses, the falsification records, design/fatal-risks/README.md, the naming provenance blocks and design/roadmap/proposals/. The two newest series show it most sharply. Names have three empty weeks, because the convention that records a ratification was invented on 2026-08-04. Proposals have seven, because the directory was created on 2026-09-04. Neither is backfilled, and each section says so where its bars are.

Weeks are ISO weeks in UTC

That is this tree's date convention. The first commits are stamped 2026-07-12 in the architect's local time and fall on the Monday in UTC. So the series starts at 2026W29, and there is no 2026W28.

The charts show the ten most recent weeks; the CSV keeps every one

This was calef's call on 2026-09-19. So 2026W29 leaves the charts when 2026W39 arrives, and stays in its measure's CSV. That CSV is also the table view the charts rely on for the three colors that sit under 3:1 on a white page. A week is never deleted, only no longer drawn.

A week is spelled 2026W36, everywhere

The chart axis, the CSV's week column, script/metrics' own output and the deck's prose all use it. calef ratified that on 2026-09-02. The page had been carrying three spellings at once: 2026-W30 in the narrative, 202636 on an axis, and 2026-W29 in the data.

It is ISO 8601's designation with the hyphen dropped. It still sorts lexically, and it cannot be misread as an ordinary number the way a bare 202636 can. It is also the dictionary key that makes rerunning script/metrics replace a row rather than add one. The axis label is that key, not something derived beside it, so the two cannot drift apart.

How the series stays current

script/metrics --update recomputes the current week's row and redraws the charts. It also restates any past week whose row is not at that week's last commit, so the first run after a week ends closes it with whatever merged after the previous run. .github/workflows/metrics.yml runs it daily (calef asked for this on 2026-09-23). It opens or refreshes a pull request if anything changed, following toolchain-bump.yml, the closest existing shape.

Coverage stays weekly, taken on Monday only. It needs a build, and a daily build would be seven script/coverage runs for a column nobody reads more than once a week. (The interface series, milestone 610 (the interface's stability is measured weekly), also builds, with cargo doc, and runs daily because two week-end trees cost seconds; its cells are carried the same way.) So script/metrics carries the cell forward on the other days rather than recomputing it. The row is keyed by ISO week regardless: the daily runs update the current week's row in place and add no rows between Mondays.

The data is one CSV per measure, in the tree and versioned with the code it describes. So the deck renders the repository's own numbers rather than holding a copy that can rot. A measure's file carries only the weeks it has something to say about. A series that began in 2026W39 starts there rather than trailing ten blank cells.

One column the scheduled run cannot produce, and what stands in for it

The workflow runs daily on a GitHub runner with a fresh checkout. It cannot see the session records the cost columns are measured from, and no workflow ever will: those records live under ~/.claude/projects/ on the machine the lanes ran on. So a person captures machine effort by running script/effort --update on that machine and committing the result. That is rung four of AGENTS.md's ladder, and rung four is where this tree's failures live.

Two mechanisms stand behind it, because it can die in two different ways:

Neither of them invents a number. A week that nobody captured stays absent, and the chart draws it as absent. This tree has twelve recorded instances of a missing failure signal being read as a pass, and a cost series that quietly stopped updating would be the thirteenth.

--update refuses to lower a figure a past week already carries, and says which week and column it refused. That is the failure this measurement actually has: transcripts get pruned, a later run sees less, and the smaller number overwrites the larger one without comment.

Idempotence

It is idempotent by how the file is written, not by a check on top. The CSV is never appended to. It is read into a dictionary keyed by ISO week, and the week being written replaces its own entry. The whole file is then rewritten from that dictionary, in sorted week order with a fixed column order. So running it twice in one week produces the same bytes, and so does a backfill against a history that has not moved. script/metrics --check is exactly "run it into memory and compare", which is why it can be trusted to say whether the tree is current.

The representative commit for a week is the first-parent commit with the greatest committer date inside it. First-parent, because that is the trunk a reader means by "the tree on that date". Committer date, because a merge's author date can be days old and would file the merge under the week its branch was cut. For a past week that answer never changes, which is the other half of the idempotence. For the current week it is HEAD, and the row moves as work lands.

A dated reading kept for the record: two days of movement in 2026W39

The 2026W39 row was last computed 2026-09-21, the morning the scheduled workflow's Monday run merged it (.github/workflows/metrics.yml, 0 6 * * 1). That was the automation working as designed at the time: the workflow then ran on Mondays and has run daily since (0 6 * * *). The row was refreshed weekly on purpose, so it would not open the same near-empty pull request six times in a row for a quiet week. The two days since were not quiet. So script/metrics --update was run by hand on 2026-09-23 to catch the row up mid-week, the mechanism already documented for this case.

The biggest mover is merged_pull_requests: 17 to 108, all verified against git log --first-parent for the same range.

unsafe_trust_unclassified reappeared, 0 to 16. This is a data gap, not an instrument change. helpers/rust_source.py was not touched in this window, but its hand-maintained crate tables were. Four crates/ directories landed in those two days that none of KERNEL_ONLY_CRATES, USERSPACE_ONLY_CRATES, SHARED_CRATES or BOOT_CHAIN_CRATES know about yet: boot_slot, current_cpu_contract, file_allocation_table and top. current_cpu_contract carries the unsafe blocks; the other three carry none. "The same unsafe blocks, by trust boundary" in unsafe-series.md already names this limitation of a table read once and baked in. unsafe_trust_boot_chain also moved, 37 to 62, and that is real growth in uefi_loader/sealed_pair, not a classification artifact.

The token and cost columns did not move, deliberately. lane_tokens, lane_wall_clock_hours, price_per_mtok_at_date and cash_spend for 2026W39 are byte-identical to the 2026-09-21 row: 506,140,600 tokens, 12.0 hours, $0.439/Mtok, $0.00 cash. notes/project-metrics/effort.csv was not recaptured. The only way to recapture it was to run script/effort from the same session, which would fold that session's own token consumption into the week it was reporting.

So the effort chart's "million tokens per milestone" line for 2026W39 fell from 253.1 to 31.6 in this redraw. All of that fall is milestones_built_this_week growing from 2 to 16 under an unmoved numerator, not tokens getting cheaper. It remains the most understated cell in the deck, now more so, because two of the week's busiest days are not in the capture. coverage_lines_pct for 2026W39 is still empty, as it was on 2026-09-21: nothing here re-derives coverage, and this update did not run script/coverage.

One earlier week moved too, by the mechanism already documented. 2026W31's milestones_built_this_week went from 20 to 21. script/metrics reads that column from today's tree for every week, on purpose (see "Milestones built each week" in landed-each-week.md). So a BUILT date discovered since the last run can still move a week that closed seven weeks ago. 2026W38's effort ratio moved from 67.8 to 65.7 for the same reason: its milestones_built_this_week corrected from 62 to 64.