roadmap BUILT

519. What this project costs, tracked where it cannot rot

Built 2026-09-21, on calef's request (2026-09-21). What nife would have to be to change anyone else's behavior starts with a cost number, and this block makes the tree able to state one. What the first capture found, and what it found already gone, is in the record below.

Why this is a milestone and not a note

AGENTS.md's second principle says the method is a result. A method's result is a cost, and this tree measures only scale: milestones, lines, harnesses, proofs, and a velocity chart. None of it answers what an outsider asks, which is what a trustworthy system costs to build this way.

The literature this project is compared against is denominated in exactly that unit. seL4 reports about eleven person-years plus nine more at a 20:1 proof-to-code ratio; Atmosphere reports 1.5 person-years on verification alone at 3.32:1. Those numbers move institutions in a way a feature list does not.

And the inputs are known today and unrecoverable tomorrow, which is what makes this urgent rather than tidy. See the deadline below.

What is known, as of 2026-09-21

input figure source
Human effort about ten person-weeks calef works on nife full time, so one calendar week is one person-week. His own statement, 2026-09-21
Inference $200 a month since 2026-07-12, about $470 to date calef, 2026-09-21
Hardware $89.99 for argon, the Jetson TX1 milestone 127 (the seL4 machine: a Jetson TX1)'s own record
Other hardware $181.82, and the line above is wrong xenon was bought for this project: milestone 87 (the x86_64 bare-metal machine) records the OptiPlex, its serial module and the RS-232 chain, bought 2026-08-15 for the third ISA target ยง19 (architectural parity is a tenet; the targets are aarch64, riscv64, and x86_64) names. Corrected by this lane against the tree; the original line was written from memory
Still unpriced no purchase record in this tree radon, the UART adapters and the smart plugs. notes/riscv-port.md's "~$70" is a sentence about the market, not a receipt, and the ledger leaves the row out rather than guess
Machine effort 22.3 billion tokens over six weeks, captured 2026-09-21 the harness's session records on patagonia, which this tree now keeps a committed aggregate of in notes/project-metrics/effort.csv

The shape those numbers make is the finding, and it should be stated before anyone optimizes the wrong term. Cash to date is under a thousand dollars all in, against about ten person-weeks of one experienced engineer's full attention. At any plausible rate for that time, the cost note puts the person at about 99%. The claim this project can honestly make is not that software became cheap; it is that the scarce input is still a person, and what changed is how much one person's attention can be made to carry.

The deadline, which decides the sequencing

Every other column in notes/project-metrics/weekly.csv is computed from a git revision, so history backfills by reading the tree at a past commit: that is how the mutation census and the velocity column were both filled in retroactively.

Token and wall-clock records are not in git. They live in session task records outside the repository and they are discarded. The ten weeks behind us are already unrecoverable, and every week that passes without capture is another one lost. The small version now beats the complete version later, because this week's numbers exist today and will not exist next week.

What to build

  1. Columns in the weekly series, in script/metrics, because the deck exists and its page already has the conventions for being honest about its own numbers:

    column source note
    human_person_weeks 1.0 per calendar week, by calef's standing datum corrected by hand when it stops being true
    lane_tokens task records, summed per week the physical quantity
    lane_wall_clock_hours task records conflates queueing; say so
    price_per_mtok_at_date recorded by hand when it changes what makes dollars re-derivable
    cash_spend subscription plus dated purchases what was actually paid
  2. A ledger for what is not weekly: hardware purchases with dates and prices, and the subscription's start date and rate. One committed file, appended to, never regenerated.

  3. One chart, and it is a ratio rather than a total. Machine effort per milestone built, beside the velocity chart. A total says the project is busy; a ratio says whether the method is getting cheaper, which is the claim.

  4. The mechanism that keeps it current, which is the half that usually fails. Weekly capture must not depend on anybody remembering: the metrics workflow already runs on a schedule, and the question a lane has to answer is what it can read without a human present. If the honest answer is that some input needs a person once a week, say so and make the gap visible rather than pretending otherwise. (script/cadence-check is this tree's existing shape for a thing that is due and has not happened.)

What was built, 2026-09-21

script/effort (provisional name) reads the harness's session records on this machine and writes notes/project-metrics/effort.csv, one row per ISO week and model. It splits tokens four ways because the API prices them between 0.1x and 2x of each other, and splits by model because this tree's mix is roughly half claude-opus-5 and half claude-sonnet-5 by token. A single blended number would have had no derivation behind it, which is what the dollar refusal below is about.

Five columns in notes/project-metrics/weekly.csv, exactly as the table above specifies, filled from two committed records rather than from any revision: effort.csv and a new notes/project-metrics/ledger.md. Both are read from the working tree for every week, which is built_by_week's precedent and is there for its reason. A sixth column, merged_pull_requests, on calef's request, is derived from git's own first-parent log: 996 merges, back to the first commit, with no dependence on an API that retains ninety days.

One chart, effort.svg, and it is a ratio: millions of tokens per milestone built, beside the velocity chart. It fell from 307 in 2026W34 to 73 and 68 in 2026W36 and 2026W38.

The ledger carries hardware with dates and prices, the subscription's start and rate, and a dated table of vendor list rates per model, which is what makes the shadow price re-derivable rather than asserted.

The mechanism. A GitHub runner cannot see the session records, so the weekly workflow cannot capture them and no workflow ever will. script/effort --snapshot writes a machine-local cache outside the repository, safe to run unattended from launchd, so a week's numbers outlive the transcripts. script/cadence-check gained its one non-workflow row and reports when the committed file does not hold the current week, through the watcher patagonia already runs. --update refuses to lower a figure a past week already carries, because the way this measurement dies is a pruned transcript and a later run writing the smaller number over the larger one.

What the first capture found, and what was already gone

Read on 2026-09-21 from 477 record streams:

weeks state
2026W29 - 2026W33 gone. No session record survives anywhere on this machine. Five weeks, from the first commit on 2026-07-12
2026W34 - 2026W39 captured. 22.3 billion tokens, 523 machine-hours, six weeks

They are recorded as absent, not zero, in the CSV and on the chart, which now draws a marker for a week nobody measured. Coverage's own 2026W29 gap got the same marker; it had been a sentence in a subtitle.

What this must not become

Not time tracking for calef. A person required to log hours to satisfy a metric stops volunteering the honest ones, and the metric is worth less than what it displaces. His standing datum is accurate enough for every comparison named above; the only thing ever asked of him is a correction when it stops being true.

Not a single headline number. Three audiences want three units: person-weeks for the comparison against the literature, tokens with a dated price for the argument that the method is getting cheaper, and cash for calef's own budgeting.

Not a dollar figure that hides which dollar it means. This project pays a fixed subscription, so its marginal cost per lane is zero. A retail-API figure is a shadow price: what somebody else would pay to reproduce the work. Both are legitimate, and quoting one while implying the other is the dishonest version.

BUGS

Follow-on

Index row

The method is half this project's claim, and a method's result is a cost; this tree measures only scale, and the inputs that would answer it are discarded weekly.