574. What a lane spent on its milestone, joined from the branch it worked on
The number is provisional: the integrator mints it at merge. Promoted from the proposal what-a-lane-spent-on-its-milestone on 2026-09-22, filed 2026-09-21. Filed by milestone/519-cost-inputs from what milestone 519 (what
this project costs, tracked where it cannot rot) found while building the weekly cost columns.
(Number and slug provisional until the merge queue lands it.)
It was filed gated on milestone 519 (what this project costs, tracked where it cannot rot), which is BUILT, so the capture it needs exists. The deadline in the proposal stands as a fact rather than as a gate: this join can only ever be made over weeks somebody already captured.
The finding that makes this cheap, and it was a surprise
Milestone 519's own BUGS said machine effort could not be attributed to a milestone because
"nothing links a lane to the milestone it worked on". That turned out to be false. Every
assistant record in the harness's session files carries a gitBranch field, and AGENTS.md requires
a lane to work on a branch named for its milestone (milestone/519-cost-inputs). The join is one
regular expression over data that is already being read and already being committed.
519 did not build it anyway, and the reason is the proposal:
A branch is not a milestone. Maintainer branches carry no number. Records written on main carry
no lane at all, and there are a great many of them: a maintainer answering a question, a review, a
merge-conflict resolution. A lane that rebases, or one that is cut before its block exists, lands
work under a name that means something different. A wrong per-component cost is worse than no
per-component cost, because a figure in this shape is exactly the kind a stranger quotes.
Why it is worth a milestone rather than a BUGS line
It is the number the comparison actually wants. Milestone 519's block opens by naming seL4 at about eleven person-years plus nine more at a 20:1 proof-to-code ratio, and Atmosphere at 1.5 person-years on verification alone. Those are per-artifact figures. "This project has spent 22.3 billion tokens" is not comparable to either of them; "a verified capability-transfer path cost this much to build and this much to prove" is. The same join is what would let the deck answer whether a milestone that carried a Kani harness cost more than one that did not, which is a claim this project makes and has never measured.
And it is the input design/fatal-risks/README.md's counter-theses need in the unit they are argued in.
What a lane would have to decide
These are the questions, not the answers. A lane taking this should expect to argue for a rule and record the refusals.
- What counts as a lane's work. A branch prefix and a number in the slug is the obvious rule, and
it is not obviously right. Take a lane that gates from the main checkout, a session that answers
a question about a milestone from
main, and a maintainer branch that finishes a lane's work. Those are three different cases and only one of them is easy. - Where the unattributable goes. The honest options are a named bucket (
main,maintainer/, unattributed) carried beside the attributed total, or nothing. It must not be spread across milestones pro rata, which would manufacture a number for every block in the tree. - Whether the record is per-milestone or per-branch. Per-branch is what the data says and is uninteresting; per-milestone is what a reader wants and needs the mapping above.
- Whether a milestone's cost is ever final. A block that is corrected, extended, or reopened accrues more. A cumulative figure is honest and never settles; a first-build figure settles and understates.
What it is not
Not time tracking, on the same grounds 519 refuses it: this is machine effort, and nothing here asks a person to log anything.
Not a per-milestone dollar figure, unless it carries 519's own labels. This project pays a fixed subscription, so the marginal cost of a milestone is zero dollars, and a retail figure is a shadow price. A cost-per-milestone number that did not say which of the two it was would be the exact failure 519 spends a section refusing.
Index row
Every session record already carries the branch a lane worked on, so the join from machine effort to milestone is on disk. What is missing is a rule for the cases where a branch is not a milestone. A wrong per-component cost is worse than none.