Running the proofs in CI: timings, sharding and --affected-since
An appendix to notes/verification.md, which keeps the command and how many packages carry harnesses. This file holds the history of how long the suite takes, how it is sharded, and how a pull request that cannot reach a proof skips it.
Where the harness count comes from
The harness count is generated weekly into notes/project-metrics.md. A count typed into the
parent conflicted on every merge that added a harness. Some history of the count's growth:
- Milestone 198 (a package manager) added two harnesses on 2026-09-23, in
crates/package_archive. Both take 4 seconds. - Milestone 304 (
cargo kani -p kernelonly ever compiled one architecture) added two, inkernel/src/arch/x86_64/interrupt_controller.rs. Only an x86_64 host runs them, which means theproveshards since milestone 587 (most CI jobs do not need an arm64 host). So the count is of the tree, not of any one run, and no single host compiles all of them. - Milestone 161 (the x86_64 kernel port) added eight on 2026-09-19, the block-leaf proofs in
crates/page_tables.
The package count carries a <!--count:--> marker that script/lint re-derives each build. The
harness count did too. Either could still be wrong about what it counted, and one was. It answered a
narrower question than the prose asks. Milestone 212 (script/falsifications walks crates/ only,
so the ratio it prints is not the tree's) found that. The derivation walked crates/, and so
excluded kernel and user, both of which are rows in the parent's table. The timing below is
still a dated measurement, because a wall clock is not a thing a gate can cheaply re-derive. See
notes/counted-claims.md.
Parallelism, measured 2026-08-03
Harnesses within a crate verify in parallel, -j 4 by default. VERIFY_JOBS overrides it. The
script's comment explains the memory bound and the terse-output trade. Measured on 2026-08-03, all
exit-clean on the same tree:
| machine | serial | -j 4 |
|---|---|---|
| dev Mac (Apple Silicon) | 21m40s | 11m19s |
| CI (4-core ubuntu-arm) | ~42m | expect ~20m; take the real number from the first merged run |
| cordoba (4-core Haswell) | 58m41s cold, ~40m solve | not measured; nothing decides on it |
The parallel speedup is 1.9x, not 4x, and the gap is structural. Crates still run one at a time. The wall clock cannot drop below the longest single harness (glob's), because one harness is one formula in one single-threaded solver. The cordoba row exists because a self-hosted runner there was considered and declined on these numbers.
Sharding, and where the floor moved
This is milestone 119 (the long pole is one prover). The packer balances crates by their measured seconds, so the slowest shard can never beat the slowest crate, and the slowest crate can never beat its slowest harness, one formula in one single-threaded solver. The table below holds medians over the green shard jobs of the merge-group runs 43987371696 to 44351284576 (2026-11-17 and 2026-11-18 UTC), 34 to 39 jobs per crate:
| crate | median | largest harness |
|---|---|---|
byte_glob |
9.3 min | 7.5 min, no_magic_means_the_pattern_is_its_own_only_match |
memory_regions |
8.8 min | 3.0 min |
socket_contract |
7.1 min | 7.0 min |
machine_discovery |
6.8 min | 6.6 min |
driver_process_contract::virtual_io |
5.5 min | 5.3 min |
| serial, from the table in script/verify | 79.3 min |
A harness can outlast its crate's median because two run at once (VERIFY_JOBS=2), and the
runner's speed varies by about 1.6 times from run to run (byte_glob: 399 to 700 seconds over
those runs). Over the 33 complete five-shard runs in that window, the slowest shard took 1.18 times
the plan at the median, 1.29 at the 90th percentile and 1.37 at the most, setup included. Those
ratios against the plan for the current table give:
| prove shards | plan | slowest shard, median | slowest shard, 90th percentile | slowest shard, maximum |
|---|---|---|---|---|
| five | 15.9 min | 18.8 min | 20.5 min | 21.8 min |
| six (what runs) | 13.2 min | 15.6 min | 17.0 min | 18.1 min |
| seven | 11.3 min | 13.3 min | 14.6 min | 15.5 min |
Six keep the slowest job under its 20-minute budget at the maximum. byte_glob fills a shard alone
at 9.3 minutes, so the floor is well below six shards' plan. helpers/verify_times.py keeps the
table current, and notes/project-metrics.md charts it.
A shard that stalls
A hosted runner has about 16 GB: 15983 MiB on the Azure hosts, with 3 GiB of swap, and 15700 MiB on the AWS hosts, some of them with no swap. Unfenced, CBMC processes that outgrow it make the kernel's out-of-memory killer take the runner's own agent. GitHub then says "The runner has received a shutdown signal", the job sits until its 25-minute limit, and GitHub cancels it about five minutes later, so it reads 30.0 minutes with no log past the kill.
So the script/verify step runs inside helpers/memory_fence.py: a cgroup capped at the runner's
memory less 1536 MiB, with no swap. A harness that outgrows the cap loses its CBMC, Kani reports
that harness as failed, the fence names it in an error annotation, and the shard fails in minutes
with its log. Every 15 seconds the fence also prints its use and each running CBMC with the harness
it proves. A shard that still stalls keeps its log, because the step's own limit, 21 minutes, sits
below the job's.
Two rows have outgrown the runner. Their peaks, alone at -j 1 and as a crate at -j 2, measured
inside the fence on the runner (image 20261111.196.1, cap 14446 MiB):
| what ran | peak (MiB) |
|---|---|
byte_glob, no_magic_means_the_pattern_is_its_own_only_match alone |
8484 |
byte_glob, a_negated_class_is_the_exact_complement_of_the_class alone |
7598 |
byte_glob, the crate at -j 2 |
the cap, no_magic killed |
shard 2 at -j 2, byte_glob with KANI_APART |
12389 to 12393 |
memory_regions, the crate at -j 2 |
10937 |
Kani starts byte_glob's two largest harnesses first, and together they need more than the cap. On
the Azure hosts swap carried them; on the AWS hosts without it they lost the runner. script/verify's
KANI_APART proves the negated-class harness after the rest of the row, alone. Over four shard-2
runs (run 43784902792) the row then took 416 to 678 seconds, against 621 before.
A new harness meets the runner first in the merge queue, since pull requests skip the prove shards. One that needs more than the cap fails there, named, on every run.
The dangerous failure mode is a crate that lands in no shard, because an unproved crate is
invisible. The suite goes green faster, and nothing says a harness stopped running. So the packer
asserts on every invocation that the shards partition the table exactly. It refuses to prove a
subset while reporting itself as the suite. That was verified by running both shards against a
stubbed cargo and diffing the union against the unsharded run: identical, all 19 crates.
The required check is still one job called verify (Kani proofs). A matrix would have renamed it to
verify (Kani proofs) (1) and (2). That would leave the ruleset requiring a check that no longer
exists, blocking every merge forever. So the proving happens in a prove matrix, and a small
aggregate job carries the name and reports their combined result. See the comment at the top of
.github/workflows/verify.yml. It is the same trap that file already records for moving a job
between workflows.
script/verify --affected-since
script/verify --affected-since <base> answers a different question without proving anything: can
the diff since <base> reach a proof at all? The proofs are a function of the harness crates and
their transitive dependencies. So the script asks cargo metadata for that closure and classifies
every changed file. Only some changes report not-needed: a change confined to documentation, to
workflow files other than verify.yml, or to crates outside the closure (the kernel and the user
programs, which no proof compiles). Anything it cannot attribute, the workspace manifests and
lockfile included, runs the proofs by default. .github/workflows/verify.yml reads the last line.
That is how a kernel-only pull request stops paying the 42 minutes.