The contract crates leave in this order: the questions for the architect

The proposal holds the order and the policy. These were the decisions the earlier rulings did not settle. Each went to the architect alone, in this order. The architect ruled all five as recommended on 2026-11-01 (UTC); each section ends with its ruling. Each opens with its background, then the recommendation, then the options.

The first cut moves three program packages (disk-tools, process-tools, core-tools) into repositories of their own. Their 15 programs link 22 library crates that stay in nife today. The direction of 2026-11-01 (UTC) says nothing that leaves may reference back into nife, so a program cannot leave while a crate it links is still here.

The packages do not need the same crates. Measured on 2026-11-01, disk-tools reaches 12 of the 22, process-tools 13 and core-tools 15. Only disk-tools avoids grant_plan, the crate with the most churn and the most crossings of all 22. The version-declaring note that pull request #3022 added pulled grant_plan into every program, because the note's type lived there; on 2026-11-01 (UTC) the note's type moved to the leaf crate interfaces_note, so the sentence now holds for the measurement only.

Recommendation: (a). The cut waits for its crates and leaves package by package, disk-tools first, then process-tools, then core-tools. The note's type moves to a leaf crate of its own, so disk-tools need not wait for grant_plan.

Ruled 2026-11-01 (UTC): (a). Milestone 756 (process-tools, core-tools and disk-tools are the first code to leave this repository)'s single cut gives way to package-by-package departure, each package leaving as soon as the shared crates it links have left, in the order disk-tools, process-tools, core-tools. A crate only one package uses leaves with it, in its repository. The INTERFACES note type moves into its own small leaf crate, and block_roster_contract stays the first consumed crate.

This lane read helpers/interface_declarations_check.py against the move and did not run it. The lint stays correct but fails until two things move with the crate. The new crate is linked and in none of the check's three tables, so it needs an INTERFACE_ID or an OWED line. And named_crates and the selftest hard-code capability_manifest_note:: as the macro's crate, so a program naming the macro by the new path would read as linking the old crate. Slots such as DOMAIN_SLOT stay in grant_plan.

2. One repository per contract crate, or a few grouped repositories?

The split's rule for a program package is one repository per package, holding its programs and the crates only it uses (§316 (a program package leaves as one repository, with the crates only it uses)). A crate published on its own, or one that more than one repository consumes, gets one repository per crate. Each uses a shared workflow template (milestone 857 (crates released on their own, and proofs offered to the projects that already exist)). The 22 contract crates belong to four packages: contracts holds 17, runtime 2, network 2 and fixtures 1.

The measurement says grouping buys almost nothing. Of 348 focused commits in 30 days that touched the 22, 244 also changed code outside them, and only 5 changed two of them while staying inside. So the number of two-repository changes is about the same at either grain. What differs is overhead: 22 repositories each carry the template, its rulesets and its CI, and each crate can carry its own version.

Recommendation: (a), one repository per crate, named after the crate, on the crate template.

Ruled 2026-11-01 (UTC): (a), 22 repositories. A crate's repository appears when the crate moves and only once the architect approves that exact repository; no lane creates one. The architect refused (b) and (c).

3. Does the architect hold on a semver break apply to contract crates?

The crate template labels a pull request needs-architect when cargo-semver-checks reports a break against the last published version, and the hold keeps it red until a ruling. The architect kept that rule for released crates. Contract crates break often: grant_plan changed 227 public items in four weeks, and the direction of 2026-11-01 expects that to continue.

A hold on each break would put every such change in the architect's queue. The wire identity (INTERFACE_ID, VERSION, a magic) is what other repositories and binaries act on; the compiler catches a Rust-API break at every consumer's next pin bump.

Recommendation: (a). For contract crates, a Rust-API break must bump the Cargo minor, checked mechanically with no hold, and a change to a wire identity value keeps the hold. This is the less strict option, against the habit of choosing the stricter one on a close call. It is not close: five identity changes in 90 days is a workable queue, and hundreds of API breaks a month is not.

Ruled 2026-11-01 (UTC): (a). The hold on a cargo-semver-checks break applies to wire-identity changes only (INTERFACE_ID, VERSION, a magic); a Rust-API break must bump the Cargo minor, checked mechanically with no hold. Telling the two apart mechanically needs the 14 crates that lack an INTERFACE_ID to get one first. The crate template change is a follow-on.

4. Does basalt refuse an image whose components pin different revisions of one contract?

Once a contract lives in its own repository, nife and a program repository each pin it by commit. They can pin different commits. basalt could build the image as each component pinned it, could override every pin with its own, or could refuse the mismatch.

Recommendation: (a), refuse. The image is then a set in which every pair agrees by construction, and the pull request that moves one contract moves every pin of it.

Ruled 2026-11-01 (UTC): (a). basalt refuses the image, and the bump pull request that moves a contract moves every pin of it together. The architect refused (b) and (c).

5. May basalt run a trial on commits that have not merged?

The workspace rule says a pin never names an unmerged commit, and basalt refuses one. So basalt can prove a breaking pair only after both halves merge. A trial run would be a manual workflow that takes candidate commits, merged or not, builds and checks them as one image, and writes no pin and no file.

Recommendation: (a), allow the trial, since it writes no pin. It proves a pair before either half merges.

Ruled 2026-11-01 (UTC): (a). basalt may run a manual trial workflow on unmerged commits of repositories in the organization, never on a fork's pull request and never on a self-hosted runner for a fork. It writes no pin and no file. The pin rule stands: a pin never names an unmerged commit.

6. Where does redoxfs go?

Ruled 2026-11-01 (UTC), after the five above. The vendored engine (vendor/redoxfs with its pin file, divergence patch series and upstream-status record), redoxfs_server and the host tool tools/redoxfs_host leave as one repository holding all three. They leave after the contract crates they link, and they consume those by a rev pin with the version stated, like every consumer. The script/vendor-verify and vendor-watch checks move with them. Splitting the engine out later stays possible. The architect refused the engine alone in its own repository, and refused staying in nife until the end. Step 9 of the order places it.

Linked set, read from cargo metadata on 2026-11-01 (UTC): the server and the host tool reach 10 of the 22 through normal dependencies (address_space_layout, capability_manifest_note, domain_name_resolution_contract, domain_name_system, file_system_contract, file_system_fixture, byte_glob, globally_unique_identifier_partition_table, grant_plan, program_argument_contract). They also reach two crates outside the 22, subtree_scope and memory_region_heap, which leave first (memory_region_heap only for the target build's el0 feature, with user_mode_runtime and moho_abi behind it). entropy_contract is named in mkfs.rs prose and is not a dependency, so it need not have left. Both manifests also patch talc to vendor/talc, a reference back into nife that the ruling above does not place; the proposal's talc section records the maintainer's provisional decision of 2026-11-01 (UTC). Unverified, not decided:

talc, decided by the maintainer on 2026-11-01 (UTC) and provisional (the proposal states it), with the read-only checks of that day:

7. Do the contribute-disposition crates wait to move?

Ruled 2026-11-01 (UTC): no. The ruling of 2026-10-27 (contribute rows wait until a published crate has users who ask upstream) covers the upstream offer only. The four contribute crates among the 22 (globally_unique_identifier_partition_table at step 2, byte_glob and domain_name_system at step 5, calendar at step 8) move in the order like the other 18. Each gets its own repository, tag and version and a consumer pins it by rev with the version stated. Each waits for the architect's hand review under amended §247 (the split begins with basalt holding nife, and procps moves first). Nothing is offered upstream, published or sent; that stays gated on the 2026-10-27 ruling, approval of each upstream submission and the AI-policy ruling (milestone 857, fork 8). A crate later contributed has its repository as the source of the offer.