357. NOT-STARTED is the third status that can be false, and milestone 75 is the proof
Both halves checked against the tree on 2026-09-19, and both held.
design/roadmap/0075-cycle-counter-authority.md still reads NOT-STARTED with Gate: DECISION,
though DECISIONS §139 answered that decision on 2026-09-02 and milestone 74's own gate line now
opens "Both halves of this line are under correction" and says in full why 75's status is false.
script/roadmap's ANSWERS tuple is still BUILT, REMOVED and PARTIAL. With SUPERSEDED, the
uncovered statuses are five rather than the three the title claims (NOT-STARTED, IN-PROGRESS,
OPTIONAL, RECORDED, SUPERSEDED), and IN-PROGRESS keeps its one mechanical check.
Fixing milestone 75's status is a paragraph and a word, and the design question
behind it is answerable by reading script/roadmap and the four uncovered statuses.
In brief. Milestone 247 (follow-on work named by a finished milestone goes nowhere) gated BUILT and REMOVED. Milestone 252 (a PARTIAL block claims work is remaining and nobody re-reads it) gated PARTIAL. Three
statuses are left uncovered (NOT-STARTED, IN-PROGRESS, OPTIONAL, RECORDED), and at least one
of them rots the same way. design/roadmap/0075-cycle-counter-authority.md reads NOT-STARTED with
Gate: DECISION for a decision calef made on 2026-09-02 (§139) and two milestones built the same
week (229 on 2026-09-02, 237 on 2026-09-03). Three separate blocks cite 75 as a live blocker, and
one of them, milestone 74, carries MILESTONE 75 in its own gate line, so the staleness propagates
into the readiness report a maintainer uses to brief lanes.
What is worth deciding
- Fix 75 first, which is a status word and a paragraph, and re-read the gate lines that name it. That is worth doing whether or not anything below happens.
- Then the question this proposal exists for: whether a
NOT-STARTEDblock can be checked at all. APARTIALblock enumerates work, so the gate can demand the enumeration. ANOT-STARTEDblock asserts one thing, that nothing has been done, and the tree cannot see that. - The one mechanical handle that does exist: a
DECISIONgate on a block whose decision file isDECIDED, and aMILESTONE Ngate where N is BUILT.script/roadmapalready refuses the second case for a gate line; it does not connect aDECISIONgate to any file, because a gate line does not name one. Making it name one would be a real check and a real cost. IN-PROGRESSis already the one status with a mechanical check (its branch must not have merged), added for the same reason after all six were found false. It is evidence that this family of defect is worth gating where it can be.
BUGS
- The gate for
NOT-STARTEDmay not exist. If the honest answer is that only a person can tell, this proposal ends with 75 fixed and a sentence innotes/roadmap.mdsaying so, and that is a legitimate outcome rather than a failure. Milestone 252's own block reserves the same right. OPTIONALandRECORDEDare deliberately off the work list, so a stale one costs less than a staleNOT-STARTED, which is offered to lanes as ready work.
Index row
Milestone 247 gated BUILT and REMOVED, milestone 252 gated PARTIAL, and the rest of the status
vocabulary rots with nothing watching it. design/roadmap/0075-cycle-counter-authority.md is the
proof: it reads NOT-STARTED with Gate: DECISION for a decision calef made on 2026-09-02 and a
mechanism two milestones built the same week. Three blocks cite it as a live blocker, and milestone
74 carries MILESTONE 75 in its own gate line, so the staleness propagates into the readiness report
a maintainer briefs lanes from. Fixing 75 is a word and a paragraph and is worth doing on its own.
The question behind it is whether a NOT-STARTED block can be checked at all. A PARTIAL block
enumerates work so a gate can demand the enumeration, while a NOT-STARTED block asserts that
nothing has been done and the tree cannot see that. The one mechanical handle that exists is a
DECISION gate whose decision file reads DECIDED, and making a gate line name that file is a real
check with a real cost.