roadmap BUILT

252. A PARTIAL block claims work is remaining and nobody re-reads it

Built on 2026-09-03. Minted the same evening milestone 247 (follow) shipped, by calef, after a PARTIAL block was found describing as remaining two things the tree had finished. Built the same day: all 22 PARTIAL blocks swept and answered, Outstanding. added to the vocabulary, and script/roadmap --check extended to refuse a PARTIAL block with no section. (Number provisional until the merge queue lands it.)

In brief. Milestone 247 made every BUILT and REMOVED block carry a ## Follow-on section saying what became of the work it named, and script/roadmap --check fails a block that does not. PARTIAL is not in that set, and it is the status where this failure is most likely.

Milestone 16 (real hardware + IOMMU-backed driver isolation, RISC-V first) is the worked example and the reason for this block. It listed three things as remaining. Two of them were done: the on-board test-suite exit is the UART marker plus SBI SRST that every board run is judged by, and the DTB-driven UART IRQ printed source 32 on all nine boots of the 2026-09-03 series. The block said otherwise for weeks, and it was caught by calef asking what was left rather than by anything in the tree.

Why PARTIAL is the worse case, not the lesser one. A finished block is written once and closed. A PARTIAL block is a standing claim about the future that gets edited as pieces land, and nothing re-reads what it still asserts. Its prose is also the thing lanes read when deciding what to pick up, so a stale one does not merely misinform: it offers work that does not exist.

22 blocks are PARTIAL today. Milestone 16 is one. Nobody knows how many of the other 21 are in the same state, and that number is the first thing this milestone should produce.

What "follow-on" means for an unfinished block, which is the design question

For a BUILT block the question is what happened to the work this named. For a PARTIAL block it is what is still outstanding, and is that still true, which is a different sentence and may want a different section or different words. Milestone 247's seven dispositions may fit as they are: Done. already exists, and it is exactly what milestone 16's first two items needed.

Resolve that before sweeping, and say which way it went. Reusing ## Follow-on unchanged is the cheaper answer and probably the right one, since a second section name is a second thing to remember. But if the words do not fit, forcing them would produce dispositions that lie in a new way.

What the gate can and cannot do is unchanged from 247 and should not be overclaimed: it can check that the claims are enumerated and that each resolves to something that exists. It cannot check that a claim is still true. What actually catches staleness is a person writing the dispositions out, which is what 247's sweep demonstrated when it found three items already built, two of them stale inside a ## Follow-on section for a month.

The proof that this milestone worked

All 22 PARTIAL blocks carry dispositions for their outstanding work, and the gate refuses a PARTIAL block that does not, demonstrated by removing one and watching it go red. Four ways, each with its own message: the section missing, None. on a PARTIAL block, Outstanding. on a finished one, and a bare Outstanding. with no prose saying how it was checked.

The count that makes it worth having done: 56 of the 215 dispositions record a claim the tree disproved, and every one of the 22 blocks carried at least one. That last part is the result. Not a long tail of a few rotten blocks: all of them, including the three the sweep singled out as unusually well maintained. Milestone 16, which is why this block exists, was not the outlier it looked like; it was the one calef happened to ask about.

What the sweep found, 2026-09-03

Six lanes read all 22 blocks in full, roughly 8,500 lines, and checked every claim against the tree rather than against the block's own prose, which is the method that found milestone 16's two finished items. 215 dispositions written. 56 of them record a claim the tree disproved, and every one of the 22 blocks carried at least one.

Disposition Count What it says
Outstanding. 82 Genuinely still this milestone's own scope, re-checked against the tree
Recorded. 46 A limitation that stays one, already beside the feature
Done. 37 Finished, and mostly finished without the block noticing
Milestone N. 34 Belongs to another block, often one this block never cited
Refused. 8 Considered and deliberately not taken
Decision. 7 Already written up under design/decisions/
Proposed. 1 Named, unowned, now a file

The 56 is a lane's judgment, not a column of that table, and the distinction is worth keeping. Not every Done. was a stale claim (a few were closed by this sweep itself) and not every Milestone N. was one (some blocks always meant to hand work on). The 56 are the items where a lane could name the file, commit or boot transcript that disproved what the block said.

Done. is the number to read, plus the 22 Milestone N. bullets naming a successor the block had not noticed. Together they are the 56.

Why every block, and not a few bad ones. Three shapes recurred, and none of them is carelessness:

And the wrong sentence is rarely only in the roadmap. notes/follow-on-work.md states it. Ten such sentences are in design/roadmap/0333-claims-the-sweep-found-false-outside-the-roadmap.md.

One block should probably not be PARTIAL at all. Milestone 207's four Community Standards items are all delivered and GitHub scores the repository at 100%; what keeps it PARTIAL is that nothing verifies the issue forms render. Its index row still says CODE_OF_CONDUCT is missing. That call is an architect's, so the block says so rather than moving.

BUGS

Follow-on

Index row

All 22 PARTIAL blocks swept: 215 dispositions written, 56 of them recording a claim the tree disproved, and every one of the 22 blocks carried at least one