252. A PARTIAL block claims work is remaining and nobody re-reads it
Built on 2026-09-03. Minted the same evening milestone 247 (follow) shipped, by calef, after a
PARTIAL block was found describing as remaining two things the tree had finished. Built the same
day: all 22 PARTIAL blocks swept and answered, Outstanding. added to the vocabulary, and
script/roadmap --check extended to refuse a PARTIAL block with no section.
(Number provisional until the merge queue lands it.)
In brief. Milestone 247 made every BUILT and REMOVED block carry a ## Follow-on section
saying what became of the work it named, and script/roadmap --check fails a block that does not.
PARTIAL is not in that set, and it is the status where this failure is most likely.
Milestone 16 (real hardware + IOMMU-backed driver isolation, RISC-V first) is the worked example and
the reason for this block. It listed three things as remaining. Two of them were done: the
on-board test-suite exit is the UART marker plus SBI SRST that every board run is judged by, and the
DTB-driven UART IRQ printed source 32 on all nine boots of the 2026-09-03 series. The block said
otherwise for weeks, and it was caught by calef asking what was left rather than by anything in the
tree.
Why PARTIAL is the worse case, not the lesser one. A finished block is written once and closed.
A PARTIAL block is a standing claim about the future that gets edited as pieces land, and nothing
re-reads what it still asserts. Its prose is also the thing lanes read when deciding what to pick up,
so a stale one does not merely misinform: it offers work that does not exist.
22 blocks are PARTIAL today. Milestone 16 is one. Nobody knows how many of the other 21 are in
the same state, and that number is the first thing this milestone should produce.
What "follow-on" means for an unfinished block, which is the design question
For a BUILT block the question is what happened to the work this named. For a PARTIAL block it
is what is still outstanding, and is that still true, which is a different sentence and may want a
different section or different words. Milestone 247's seven dispositions may fit as they are: Done.
already exists, and it is exactly what milestone 16's first two items needed.
Resolve that before sweeping, and say which way it went. Reusing ## Follow-on unchanged is the
cheaper answer and probably the right one, since a second section name is a second thing to remember.
But if the words do not fit, forcing them would produce dispositions that lie in a new way.
What the gate can and cannot do is unchanged from 247 and should not be overclaimed: it can check
that the claims are enumerated and that each resolves to something that exists. It cannot check that
a claim is still true. What actually catches staleness is a person writing the dispositions out, which
is what 247's sweep demonstrated when it found three items already built, two of them stale inside a
## Follow-on section for a month.
The proof that this milestone worked
All 22 PARTIAL blocks carry dispositions for their outstanding work, and the gate refuses a
PARTIAL block that does not, demonstrated by removing one and watching it go red. Four ways,
each with its own message: the section missing, None. on a PARTIAL block, Outstanding. on a
finished one, and a bare Outstanding. with no prose saying how it was checked.
The count that makes it worth having done: 56 of the 215 dispositions record a claim the tree disproved, and every one of the 22 blocks carried at least one. That last part is the result. Not a long tail of a few rotten blocks: all of them, including the three the sweep singled out as unusually well maintained. Milestone 16, which is why this block exists, was not the outlier it looked like; it was the one calef happened to ask about.
What the sweep found, 2026-09-03
Six lanes read all 22 blocks in full, roughly 8,500 lines, and checked every claim against the tree rather than against the block's own prose, which is the method that found milestone 16's two finished items. 215 dispositions written. 56 of them record a claim the tree disproved, and every one of the 22 blocks carried at least one.
| Disposition | Count | What it says |
|---|---|---|
Outstanding. |
82 | Genuinely still this milestone's own scope, re-checked against the tree |
Recorded. |
46 | A limitation that stays one, already beside the feature |
Done. |
37 | Finished, and mostly finished without the block noticing |
Milestone N. |
34 | Belongs to another block, often one this block never cited |
Refused. |
8 | Considered and deliberately not taken |
Decision. |
7 | Already written up under design/decisions/ |
Proposed. |
1 | Named, unowned, now a file |
The 56 is a lane's judgment, not a column of that table, and the distinction is worth keeping.
Not every Done. was a stale claim (a few were closed by this sweep itself) and not every
Milestone N. was one (some blocks always meant to hand work on). The 56 are the items where a lane
could name the file, commit or boot transcript that disproved what the block said.
Done. is the number to read, plus the 22 Milestone N. bullets naming a successor the block
had not noticed. Together they are the 56.
Why every block, and not a few bad ones. Three shapes recurred, and none of them is carelessness:
- A block that accretes lane reports keeps its old questions in the present tense. Milestone
139 is eight rounds appended in order, and its "what is still open" section opens with a sentence
its own
BUGSrefutes 140 lines further down. The block is honest at every point in time and wrong when read as a whole. - A block written before a decision landed keeps citing the fork. Milestone 142 (text) waited on a font and a palette that §104 chose on 2026-08-20, seven days before that block was last edited, and it never cites §104 anywhere.
- A block's premise can be deleted out from under it. Milestone 152's "what was built" section
cites files the SMB removal deleted on 2026-08-30, and milestone 53's ranking argument rests on
milestone 55, which is
REMOVED.
And the wrong sentence is rarely only in the roadmap.
notes/follow-on-work.md states it. Ten such sentences are in
design/roadmap/0333-claims-the-sweep-found-false-outside-the-roadmap.md.
One block should probably not be PARTIAL at all. Milestone 207's four Community Standards
items are all delivered and GitHub scores the repository at 100%; what keeps it PARTIAL is that
nothing verifies the issue forms render. Its index row still says CODE_OF_CONDUCT is missing.
That call is an architect's, so the block says so rather than moving.
BUGS
- It cannot tell a stale claim from a live one, which is 247's limitation inherited whole. The value is that the claims become enumerable and that somebody reads them once.
IN-PROGRESSand the rest of the status vocabulary are still outside this. Whether they want the same treatment is not answered here, and a status that means "a lane is on it right now" has a much shorter staleness window thanPARTIAL, which can sit for months.- A
PARTIALblock's outstanding work is often the milestone itself, not a follow-on, so there is a real risk of ceremony: writing**Milestone 74.**under a heading when the block's own prose already said it. If that is what the sweep finds, the honest outcome is to say the section buys little forPARTIALblocks and to record that rather than shipping a gate nobody gains from.
Follow-on
- Milestone 357.
IN-PROGRESS,NOT-STARTED,OPTIONALandRECORDEDare still outside this, as theBUGSabove says, and the sweep found a worked example of a false one. Milestone 75 (who may read the cycle counter, and by what authority) reads NOT-STARTED on aDECISIONgate for a decision made 2026-09-02 and built twice that week, and three blocks cite it as a live blocker.design/roadmap/0357-the-statuses-the-follow-on-gate-does-not-cover.md. - Milestone 333. The ten stale claims the sweep found in code comments, rustdocs and notes, where no gate reads them. Re-checked on 2026-09-19 at promotion: eight still stand, one is closed and one wants a re-read.
- Milestone 358. Milestone 139's log-page walk, which round 8 asked to have minted and nobody
did, is
design/roadmap/0358-the-unsafe-log-page-walk-in-revoke.md. - Done. Two of milestone 117's own handoffs had rotted a second time and were fixed here by
deleting the duplicated fact rather than re-copying it:
CONTRIBUTING.mdno longer listsscript/gates' stages andscript/setupno longer repeats the toolchain date. - Done.
script/roadmap's header described a--unsweptmode that never shipped, left as half a sentence spliced onto the next when milestone 247 removed its exemption list an hour after writing it. Corrected here, by the lane that was reading the header in order to add to it. - Decision. Whether milestone 207 (the four things GitHub asks for) should be
BUILTrather thanPARTIALis an architect's, since a status word is a claim about the tree and this lane does not move another milestone's. The evidence is in 207's own## Follow-onand indesign/decisions/nowhere: it is one line in a review, not a decision file. - Recorded.
Outstanding.is a provisional name, like the seven words it joins. It is recorded as provisional inscript/roadmap's own comment and innotes/roadmap.md, which is where that vocabulary moved when the roadmap index was retired on 2026-09-21.
Index row
All 22 PARTIAL blocks swept: 215 dispositions written, 56 of them recording a claim the tree
disproved, and every one of the 22 blocks carried at least one