Follow-on work, and what happened to it
Name: provisional (milestone 247 (follow)). It names the thing it tracks, per §75 (provenance)'s noun rule, but calef names notes as he names everything else in the tree. The six disposition words below are provisional in the same way.
A milestone finishes and, on its way out, names work it is not doing. A hazard it noticed, a design fork it could not settle, a second phase somebody should take. That work is what this project keeps losing, and this note is the mechanism that stops it, plus the sweep that proved the mechanism was needed.
The failure, three times
- Milestone 90 (guard) exists only because calef happened to be at his desk the day a lane report named its finding. Nothing else would have caught it.
- Milestone 94 (untracked) swept the tree for exactly this category, and then left its own inventory in a pull request body for twelve days. By the time anyone came back, the item-level list was gone and had to be re-derived (notes/untracked-work-sweep.md).
- Milestone 244 (largest), on 2026-09-03, named an unvouched-binary hazard in a
BUGSsection and a design fork in a handoff paragraph. Both surfaced because calef asked "any work to follow up on 244?" by hand, which is the mechanism today and is rung zero: somebody has to remember to notice.
AGENTS.md carries the rule. "Identified work leaves the lane in a tracked form, or the merge waits." What it does not carry is anything that fires when it is not followed, and the rule as written is rung four: a lane report is read once, by one person, on the day it is written.
The mechanism: a section a finished block has to answer
Every BUILT, REMOVED or PARTIAL milestone block carries a ## Follow-on section, checked by
script/roadmap --check and therefore by script/lint. (PARTIAL is milestone 252's addition,
below.) The dispositions are tabulated in notes/roadmap.md, which is where a block author
meets them. In short: None., Milestone N., Done., Recorded., Refused., Decision.,
Proposed., and Outstanding. for a PARTIAL block's own remaining scope.
Why it hangs on the status rather than on a marker in prose. The moment a block turns BUILT is
the last time anyone reads it on purpose, so it is exactly the moment the work gets buried. It is
also a state a script can see, which prose intent is not: AGENTS.md priced the greppable alternative
at git grep -w TODO's 82% false-positive rate, and a check that cannot tell an observation from an
intention gets disabled within a week. Nothing here reads a block's prose looking for intent. It
checks that a finished block was asked the question, and that whatever answer its author wrote
resolves to something.
This is the third instance of a shape the tree knows, which is most of the argument for it.
script/lint fails a TODO that does not name a milestone. script/citations checks that a
glossed citation is grounded in the document it names. And this checks that a disposition resolves
to a block, a file, a reason, or a decision.
None. and Recorded. are deliberately the cheapest things to write. An over-strict version of
this gate is worse than the burial it prevents. If every observation in a BUGS section had to
resolve to a milestone, the honest thing to write becomes expensive, people write less, and the tree
gets worse. Recorded. points at a BUGS entry and never replaces one. The FreeBSD posture is
upstream of this check and is not touched by it.
An explicit refusal is a success. The defect this attacks is silence, not the absence of a milestone.
Proposed. is the disposition the sweep asked for, and it is the point
Four of the words were designed before the sweep. Unclaimed. and Done. were not: three lanes
asked for the first and four for the second, independently, on the same afternoon, having hit the
same wall. A block that wrote its follow-on work down honestly, in the place a reader meets it, and
had nobody pick it up, fits none of the original words. Recorded. lies about intent and Refused.
lies about the decision, so a lane forced to choose writes the more comfortable one, and the lanes
that would not lie left the item out instead. That is the silence this gate exists to stop,
arriving through the gate itself.
Then the constraint that made Unclaimed. necessary was removed, the same day. calef ratified
design/roadmap/proposals/<slug>.md: a lane may add to the roadmap itself, with no number and no
coordination, because "on a human team, anybody should be able to add to the roadmap. That's
different than prioritizing that roadmap." The collision that barred lanes from minting was in the
number, never in the authority, and separating the two makes the burial problem much cheaper to
solve. A mechanism whose cost is "write one file" is one people will use.
So Unclaimed. became Proposed., and it now resolves to a file somebody wrote rather than
to a sentence promising that work exists. That is strictly stronger, and it is why the count of
proposals no longer has to be small: the third bucket has somewhere to go.
The economics this changes are the whole reason milestone 247 recurred three times. Before, a lane that found work wrote it in a report, the maintainer read the report, and an item either became a milestone or became a chat message. On the day this landed, the maintainer buried three identified items that way, all by deferring rather than forgetting, and calef caught all three by asking. The mechanism has to assume the maintainer is a failure point and not only the lanes, and routing the work into the tree at the moment of discovery is what does that.
The sweep, 2026-09-03
All 139 finished blocks were read in full, in twelve parallel lanes, roughly 159,000 words. 605
dispositions were written: 291 Recorded., 136 Milestone N., 105 Refused., 38 Proposed., 24
Decision., 7 None. and 3 Done.. Most follow-on prose is an honest limitation sitting where a
reader meets it, which says the BUGS convention is working.
Two findings were not in the brief. Recorded. bullets citing paths surfaced rot in the roadmap's
own prose: blocks still naming crates and files that had been renamed or moved, because nothing
checked a path cited in a roadmap block. And a block written after this convention existed is
far cheaper to sweep than one written before it, which is the case for the gate.
There was an exemption list, for about an hour, letting a block that finished before the sweep skip
the section. The sweep reached every block, the list closed to zero, and it is gone rather than kept
at zero. The table, the rotten paths and the list's history are in
follow-on-work/first-sweep.md.
What the sweep found, and which of it to promote first
38 pieces of unclaimed work are now proposal files under design/roadmap/proposals/, one each,
written by the lanes that understood them. That is the answer the morning's design could not give:
with a proposal costing one file and no coordination, the count does not have to be small, and
nothing has to be argued down to fit a budget.
Three of the 42 were done, and finding that out is the sweep's sharpest result. A lane told to
write a proposal has to go and look at the tree, which nothing had made anyone do before. Two of
the three had sat stale for a month inside a ## Follow-on section, which is this milestone's own
failure one layer in. They are Done. now, with what carried each, and the word earned its place
the day it was added. Which three, and what carried them, is in
follow-on-work/first-sweep.md.
Promotion is a different act from proposal, and it is an architect's. Five of the 42 are worth an architect's attention first, on a stated bar. The work is concrete and bounded, and nothing in the tree owns any part of it. Leaving it unpromoted costs more than tidiness, because a claim this project makes rests on it or a record in the tree is now known to be wrong.
- The three instruments nothing runs.
script/interleaving-check,script/crate-probesandscript/rule-violations --checkare referenced by neither CI norscript/ci-build.crate-probesis the instrument behind fatal risk 1, which is recorded GREEN on whatever somebody saw when they last ran it by hand. Named by milestone 232 (audit). - Replay the kernel falsification records. Six of milestone 202 (every)'s confinement claims have no replay mechanism, so they are claims resting on nothing executable. Milestone 212 (the ratio it prints) handed this back explicitly and said it stays milestone 210 (run by name)'s.
- Two address spaces drive one UART with nothing arbitrating. The kernel prints its boot tour
and its fault reports through its own driver while the userspace
consoleserver drives the same device, so output interleaves at byte granularity. It affects every bench session on argon, radon and xenon, and milestone 243 (serial)'sBUGStells readers it "has its own home", which did not exist until today. Named by milestone 230. - Attach the rest of the x86_64 test fixtures. The RedoxFS image, the GPT and blank disks, the NIC, the GPU, the keyboard and the RNG. Its measure is the 36 tests taking a "no RedoxFS disk attached" arm, and architectural parity is a gate in this tree rather than an aspiration. Named by milestones 215 and 176 independently, which is itself evidence.
- The records that went stale when the number under them moved.
design/fatal-risks/README.mdrisk 3 still reads MEASURED green on 92.4% mutation score against a published 83.4%, and AGENTS.md sayskernel/srcmeasures 40% comments against a measured 45.3%. Both are records this project asks strangers to trust.
The strongest of the rest, so the cut is visible: bounding what one mutant may allocate. One mutant goes from 1.4 GB to 15.8 GB in twenty seconds and takes the machine with it, and milestone 238's block prices three shapes for the fix. It is below the line only because nothing the project claims publicly depends on it.
The second sweep, 2026-09-03: PARTIAL, and why it is the harder half
Milestone 252, the same day. 247 covered BUILT and REMOVED. PARTIAL was outside it, and it
is the status where the claim is most likely to be false, for a reason that is structural rather
than about care:
A finished block's section is a record. A PARTIAL block's is a standing claim about the
future. It gets edited as pieces land, nothing re-reads what it asserts, and its prose is
what a lane reads when deciding what to pick up. So a stale one does not merely misinform; it
offers work that does not exist.
Milestone 16 (real hardware) is the case that minted the milestone: it listed three things as remaining, and two were finished. It said otherwise for weeks, and calef asking what was left is what caught it.
The result: 22 of 22
Six lanes read all 22 blocks in full, checking each claim against the tree rather than against the block's own prose. 215 dispositions were written; 56 of them record a claim the tree disproved; every one of the 22 blocks carried at least one.
That last number is the finding. There is no majority of blocks that were fine, not even among the
ones the lanes singled out as unusually well maintained. Three shapes recurred, and none of them is
carelessness. A block that accretes lane reports keeps old questions in the present tense. A block
written before a decision landed keeps citing the fork. And a block's premise can be deleted out
from under it. The cases, and milestone 16's two finished items, are in
follow-on-work/partial-sweep.md.
Outstanding., the eighth word
Seven dispositions say where work went. A PARTIAL block's commonest honest answer is that it has
not gone anywhere and is still that milestone's own scope. None of the seven can say it without
lying: Recorded. claims a limitation that stays, Proposed. claims nobody owns it when this block
does, and Milestone N. cannot name the block it is written in. A lane forced to choose writes the
comfortable word or leaves the item out, which is 247's own Done. and Proposed. lesson arriving
a second time.
What it buys is the date, not the word. The gate still cannot tell a stale claim from a live one. What changed is that somebody wrote "still true, and here is what I checked" beside 82 items.
None. is refused on a PARTIAL block, which is the one thing the gate can prove rather than
enumerate: PARTIAL means work remains, so a block answering that nothing is outstanding has
contradicted its own status word. That is the milestone-69 defect, a row and a block disagreeing,
one level in.
script/roadmap --outstanding prints what is left, per PARTIAL milestone, derived from the
blocks. It is the question calef had to ask by hand, answered as a command.
The wrong sentence is rarely only in the roadmap
Fixing a block repeatedly left a rustdoc, a module header or a note still saying the old thing,
where no gate reads it. Ten of those are listed in
design/roadmap/0333-claims-the-sweep-found-false-outside-the-roadmap.md, and nothing mechanical
would have caught any of them. follow-on-work/partial-sweep.md
names three.
BUGS
- A disposition can be wrong and this gate cannot tell.
**Milestone 240 (soak).**resolves whether or not milestone 240 is the work the block meant, which is the same blind spotscript/decisionsrecords for§Ncitations andscript/roadmaprecords for its own tree-wide citations. Check by content after any renumber. Proposed.andRecorded.are separated by judgment, not by anything checkable, and lanes said so. ABUGSentry that is a permanent caveat and one that is deferred work read identically in prose, and the same text can defensibly take either word. Expect the backlog to be under-counted rather than over-counted, becauseRecorded.costs a sentence andProposed.costs a file.- A well-written block generates more unclaimed items than a lazy one. A block that named its follow-on work honestly has something for the sweep to find; one that named nothing looks clean. Do not read a block's bullet count as a quality signal, in either direction.
- It cannot find work that was never written down. A hazard named only in a chat window or in a lane report nobody landed is not in the tree to be found. The count of what has been lost that way is unknowable rather than zero.
- A
PARTIALblock's section fires more than once and is therefore never finished. The gate demands it the day the status turnsPARTIALand never again, so an item that goes stale the following week is stale until somebody re-reads it. 252's sweep is a date, not a mechanism, and the next one will find the same thing. - It fires once, at the moment a block finishes. Follow-on work identified after a block turned
BUILT lands in a block nothing will re-check, because the section exists and passes. The
BUGSconvention and aTODO(milestone N)marker both still work there; this gate does not add to them. - Nothing promotes a proposal, and nothing can. A proposal nobody picks up is the same burial in
a new location. A gate on age ("no proposal older than N days") would be routed around by not
writing proposals, which costs more than the pile does. So what ships instead is visibility: the
status line carries its date,
script/roadmap --checkprints the count and the oldest on every lint run, and--proposedlists them oldest first. That is a number somebody has to choose to ignore, which is weaker than a gate and much stronger than a paragraph. - A well-stocked
proposed/directory can flatter the project. Forty-two files look like a plan and are not one. They are a list of things nobody is doing, and the honest way to read the count is as debt. - A
Recorded.bullet cannot quote a path-shaped example. The path check treats a backticked span beginning with a real top-level directory as a citation, so a bullet illustratingscript/foo --baras a command rather than as a file has to spell it without backticks. That is a real constraint on prose in a project whose subject is filenames, and it is the price of catching the rot above.