roadmap PARTIAL

225. Run the soak on radon, argon and xenon, which is the only place its answer means anything

Partial as of (2026-10-20). radon has met §259's standard, 10.29 million crossings over 3 plain boots, clean (2026-10-09 to 10, opened by 592's proven self-reset), and has added 13 reboot draws since; argon and xenon have not run it.

Correction, 2026-10-06: argon is not in hand. The board delivered as argon is a Jetson TK1 (32-bit Armv7), shipped against a TX1 order; it is going back and calef is getting the TX1 from the seller (notes/bench-runbook.md, "argon is not in hand"). The argon leg below is awaiting the board, with no date. Its plan, the tegra210 facts and script/board-console --exposure all stand. PARTIAL rather than BUILT because the block names three machines and one is done. Minted 2026-09-02 by the maintainer. It carries forward the follow-on that milestones 219 (the boot tour ends and the kernel halts, so there is nothing to soak) and 221 (the soak never crosses cores, so build the hook that makes it) proposed. (Number provisional until the merge queue lands it.)

In milestone 53's sense: the boards are on the desk and this needs hands on them. Nothing else blocks, and nothing more can be built for it.

In brief. Fatal risk 5's entire premise is that the defects appear only on silicon, and as of 2026-09-23 that premise has zero confirmed instances. This block said until then that radon had produced one, a receiver woken with nothing delivered on three harts that no emulator run had shown. That reading was retracted on 2026-08-15, the day after it was recorded and two weeks before this block was written, by notes/visionfive2.md's fifth bench stop: the dumps are the terminal state of a completed tour, identified five independent ways. Every multicore defect this project has found was found without silicon, including both x86_64 ap_boot bugs, which were found under QEMU TCG.

That strengthens the case for running this, rather than weakening it. A premise with no instances is untested, not disproved, and this milestone is the experiment that would test it.

Everything needed to run it now exists, and none of it existed on 2026-09-01:

What it needs

Bench evenings, one per machine, and the discipline to read the first heartbeat before walking away. Milestone 221's procedure is explicit about this and it is the part most likely to be skipped: wakerate should be about 100 * harts, and crossings must be rising between beats rather than frozen. The bench runbook says what a frozen count costs.

Record rounds, rate, wakes and crossings for every run, in notes/soak.md's table.

The target, ruled by calef on 2026-10-07 (UTC) in §259 (a multicore soak counts toward risk 5 at ten million crossings over three boots): at least 10 million crossings per architecture across at least 3 boots, stated before the run. A bench evening aims at the remainder: radon needs about 6 million more over at least 2 more boots, xenon the full 10 million over 3. Defects found do not reset the count.

What an answer would and would not be

A clean run licenses one sentence, which milestone 219's tooling prints on every green result: this machine did N cross-core round trips without the wake gate refusing one, without a wrong reply, and without a worker stalling. It is not proof the concurrency is correct, and the risk's own text is honest that this class of question "produces a confidence rather than a verdict".

A failure is worth far more, and is the outcome to hope for. It would be the first confirmed defect this risk has produced, and the first found by an instrument rather than by somebody watching a bench.

radon, 2026-09-25: clean, 8 h 09 m, 4.1 million crossings

One boot, netbooted, built at 9e879f1e7, watched by script/board-console --for 490m --until none to its deadline (exit 0). First beat checked before calef left: wakerate=430/s settling to 403, crossings 747 then 1,445 then rising about 140 a second. Last beat:

rounds rate wakes crossings refused / mismatch / stalled
10,193,815,048 350,753/s 11,747,350 (404/s) 4,108,581 0 / 0 / 0

radon did 4.1 million cross-core thread handoffs and 10.2 billion IPC round trips over 8.16 hours without the wake gate refusing a wake, without a wrong reply, and without a worker stalling. That is the sentence and all of it. No red means the QEMU cross-check a red would have needed never arose. The account, the anomalies (none of them a failure) and what it does and does not rule out are notes/visionfive2.md's "The eight-hour soak, 2026-09-25"; the log is bench/radon-2026-09-25/soak-8h.log; the exposure row is E4 in notes/multicore-defect-curve.md.

Why eight hours: This block prescribes no duration, so the lane proposed one against crossings rather than clock time, per notes/soak.md's duration section. On a fast draw 8 hours is 1.4 to 5.4 million crossings, against 5,507 in the only earlier multi-hour run. Past that, a second boot buys a new draw of the placement lottery, which is worth more than a ninth hour. The maintainer approved it. What remains on radon is more boots, not longer ones.

radon, 2026-10-09 to 10: §259 met, 10.29 million crossings over 3 plain boots

Lane milestone/225-radon-boots (bef2b40dc, tree-identical to main 237cef6bc), one power cycle from calef for the whole evening. It opened with the decisive bench test of milestone 592 (radon's cold reboot dies in OpenSBI's PMIC write), green. The rebooting build soaked its 120 seconds, called SBI SRST, and the board came back through U-Boot SPL to a netboot and a soak. So every boot after the first started itself, the board re-fetching over TFTP on each self-reboot; the lane swapped the served image during one reset's dark period. Three draws, zero defects:

row boot duration rate crossings
E5 the rebooting soak's 120s draw 2m 314,841/s 20,474
E6 plain soak 10h 17m 178,629/s 5,569,327
E7 plain soak 3h 53m 317,457/s 610,897

Counting plain boots only, E4 + E6 + E7 = 10,288,805 crossings over 3 boots, which meets §259's standard (at least 10 million over at least 3); E5's reboot draw adds 20,474 on top. The evening's account, including the 592 transcript's one gap and the discarded card boot before E7, is notes/soak.md, "radon, 2026-10-09 to 10"; the logs are bench/radon-2026-10-10/.

radon, 2026-10-20: 13 reboot draws, zero defects

Lane milestone/225-radon-soak-draw, image built at 22c19e1d5 with script/board-image --soak --reboot (SEALED, features board,soak_test,reboot_soak_test). The QEMU rehearsal (script/soak-test --arch riscv64 --for 45s) was clean: 787,279 round trips in 40 s, 3,743 crossings. On radon, one power-on, then thirteen 120-second draws, each ended by milestone 592's direct AXP15060 write and each back through U-Boot SPL and payload came from net: the reset was clean on 13 of 13. Every last beat reads refused=0 mismatch=0 stalled=0, wakerate 401 to 404/s.

These are rows E13 to E25 in notes/multicore-defect-curve.md. E16 and E22 never crossed cores (19 and 23 crossings, frozen from the first beat) and are excluded; the other eleven add 218,216 crossings. script/board-console --tally drew one clean core on all thirteen, 182,096 to 197,384/s, so this evening sampled one placement class. The run table is notes/soak/radon-2026-10-20.md; the capture, the mechanics and how the soak ended are bench/radon-2026-10-20/README-225.md.

radon, 2026-10-21: 25 reboot draws, zero defects, one unexplained reset

Lane milestone/890-radon-bench-to-prompt, image built on cda4ceb55 with script/board-image --soak --reboot (SEALED). The QEMU rehearsal was clean: 760,115 round trips in 40 s, 4,206 crossings. On radon, one power-on, then 25 draws of about 120 seconds, watched by script/board-console and stopped with --stop. Every last beat reads refused=0 mismatch=0 stalled=0, wakerate 401 to 402/s.

These are rows E26 to E50 in notes/multicore-defect-curve.md. Seven never crossed cores and are excluded; the other eighteen add 329,804 crossings. The tally drew one clean core on all twenty-six boots, the same single placement class as 2026-10-20. Draw 2 (E27) reset itself at about t=105 s without printing the kernel's reset sequence (BUGS). The run table is notes/soak/radon-2026-10-21.md; the capture and the mechanics are bench/radon-2026-10-21/README-225.md.

radon, 2026-10-21 evening: 36 draws that read the PMIC, zero defects

Lane milestone/225-radon-silent-reset, built at 0e0866d93 with script/board-image --soak --reboot --tftp (SEALED). Each draw's arming reads the AXP15060's startup source, PWROK control and latched interrupt status (die temperature, DCDC under-voltage, the power key), prints them, and clears the status (reboot::pmic_report). These are rows E51 to E86, 491,341 crossings over 28 crossing draws. Every reset in the capture follows the kernel's rebooting now, and every PMIC report reads startup 0x00 ... irq-status 0x00 0x00. One draw, E86, drew a placement with no clean core and ran at 30,857/s, a class E13 to E50 never drew. The run table is notes/soak/radon-2026-10-21-pmic.md; the capture is bench/radon-2026-10-21/225-pmic-report-draws.log.

What can reset a JH7110 with no line from the kernel

Every reset path this kernel takes prints first (reboot::cold_reset), so a silent reset comes from outside it:

argon, 2026-10-05: not yet a one-command run, and exactly why

(Awaiting the board, 2026-10-06: what is on the desk is a TK1 going back, not argon. The tegra210 facts below are the TX1's and stand. The "20 minutes at argon" steps wait for the TX1.)

calef ruled argon first on 2026-10-05. argon has never booted nife, and as built it cannot. The aarch64 kernel is linked, mapped and consoled for QEMU virt only (RAM at 0x4000_0000, a PL011 at 0x0900_0000), and tegra210 puts DRAM at 0x8000_0000 and a 16550 at 0x7000_6000. A booti today would be silent, and that silence would be misread at the bench as cabling or firmware. Milestone 127's two named prerequisites are built; the third, the board memory map, is unbuilt and unowned. design/roadmap/0803-argon-boots-the-aarch64-kernel.md is that work, with the fork (one binary or two) that is the architect's.

What this lane built instead, which every board's soak uses: script/board-console --exposure <log> --machine <name> --build <sha> --start '<utc>' reads a capture into the curve's exposure row in notes/multicore-defect-curve.md, with the four figures above and milestone 221's two bench checks redone after the fact. Its test reads radon's eight-hour log back into E4.

What calef can do at argon today, with no nife image (about 20 minutes)

These are milestone 127's steps 1 and 2 and its USB question, and they need nothing built. They answer the proposal's one open fact (the DRAM base) and capture the prologue script/board-console needs before it will accept --board argon.

  1. Cable: a 3.3 V USB-TTL adapter on argon's J21 header (TX, RX, GND; adapter VCC unconnected), on patagonia. Check nobody holds the port: lsof /dev/cu.usbserial-*.
  2. screen /dev/cu.usbserial-* 115200, then Ctrl-a H to log to screenlog.0.
  3. Power argon with no SD card. Expected: U-Boot's banner and an autoboot countdown. Silence is the cable, the baud, or an L4T too old to reach U-Boot; stop there and say which.
  4. Press a key to stop autoboot, then type: bdinfo, printenv fdt_addr_r kernel_addr_r, and, with a FAT32 stick in, usb start, usb storage, fatls usb 0:1 /, help bootefi, printenv boot_targets.
  5. Ctrl-a k to quit. Hand the lane screenlog.0; it goes to bench/argon-<date>/uboot.log.

Red here is any of: no U-Boot banner, a DRAM bank in bdinfo that is not at 0x8000_0000, or a hang on usb start. Each is a fact for 127, not a failure of this milestone.

The soak itself, once argon prints the banner

Unchanged from radon's procedure (notes/soak.md, "On radon at a bench"), with argon's names. The two commands marked not yet are the proposal's items 4 and the profile.

  1. Not yet: script/board-image --soak for argon, onto the SD card.
  2. Not yet: script/board-console --board argon --for 8h --until none --log target/argon-soak-$(date +%s).log, started before power-on.
  3. Read the first beat: wakerate about 400 (four A57s at 100 Hz) and crossings rising.
  4. Afterwards: script/board-console --exposure target/argon-soak-<stamp>.log --machine argon --build <sha> --start '<utc>'. Exit 0 is clean, 1 is a failure to classify.

Eight hours, for radon's reason. Red is soak-test: FAILED, a [PANIC], three missed beats, or --exposure exiting 1. Any of them is the outcome worth hoping for: the first defect on silicon.

BUGS

Follow-on

Index row

radon met §259 on 2026-10-10: 10.29 million crossings over 3 plain boots, zero defects, and its board now resets itself (592 proven); argon and xenon have not run it