225. Run the soak on radon, argon and xenon, which is the only place its answer means anything
Partial as of (2026-10-20). radon has met §259's standard, 10.29 million crossings over 3 plain boots, clean (2026-10-09 to 10, opened by 592's proven self-reset), and has added 13 reboot draws since; argon and xenon have not run it.
Correction, 2026-10-06: argon is not in hand. The board delivered as argon is a Jetson TK1
(32-bit Armv7), shipped against a TX1 order; it is going back and calef is getting the TX1 from the
seller (notes/bench-runbook.md, "argon is not in hand"). The argon leg below is awaiting the
board, with no date. Its plan, the tegra210 facts and script/board-console --exposure all stand. PARTIAL rather than BUILT because the block names three machines and one is done. Minted
2026-09-02 by the maintainer. It carries forward the follow-on that
milestones 219 (the boot tour ends and the kernel halts, so there is nothing to soak) and 221 (the
soak never crosses cores, so build the hook that makes it) proposed. (Number provisional until
the merge queue lands it.)
In milestone 53's sense: the boards are on the desk and this needs hands on them. Nothing else blocks, and nothing more can be built for it.
In brief. Fatal risk 5's entire premise is that the defects appear only on silicon, and as of
2026-09-23 that premise has zero confirmed instances. This block said until then that radon had
produced one, a receiver woken with nothing delivered on three harts that no emulator run had shown.
That reading was retracted on 2026-08-15, the day after it was recorded and two weeks before this
block was written, by notes/visionfive2.md's fifth bench stop: the dumps are the terminal state of
a completed tour, identified five independent ways. Every multicore defect this project has found was
found without silicon, including both x86_64 ap_boot bugs, which were found under QEMU TCG.
That strengthens the case for running this, rather than weakening it. A premise with no instances is untested, not disproved, and this milestone is the experiment that would test it.
Everything needed to run it now exists, and none of it existed on 2026-09-01:
- A workload that lasts (milestone 219 (the boot tour ends and the kernel halts, so there is nothing to soak)), with a heartbeat on the wall clock so a crawling machine still reports on time.
- A hook that makes it cross cores (milestone 221 (the soak never crosses cores, so build the hook
that makes it)), on the real
irq_notifytowake_load_awarepath. That path was once read as where a radon defect lived; the reading is retracted (the fifth bench stop innotes/visionfive2.md, 2026-08-15), so it is the path worth stressing, not the site of a known defect. - A console that watches and judges (milestone 216 (nothing in this tree can read a board)), with a sustained mode and a stage that re-arms the quiet check a completed boot tour suppresses.
- A boot that needs nobody typing (milestone 218 (every boot of the VisionFive 2 needs a human typing four commands into U-Boot)), unconfirmed on the board itself.
What it needs
Bench evenings, one per machine, and the discipline to read the first heartbeat before walking away.
Milestone 221's procedure is explicit about this and it is the part most likely to be skipped:
wakerate should be about 100 * harts, and crossings must be rising between beats rather than
frozen. The bench runbook says what a frozen count costs.
Record rounds, rate, wakes and crossings for every run, in notes/soak.md's table.
The target, ruled by calef on 2026-10-07 (UTC) in §259 (a multicore soak counts toward risk 5 at ten million crossings over three boots): at least 10 million crossings per architecture across at least 3 boots, stated before the run. A bench evening aims at the remainder: radon needs about 6 million more over at least 2 more boots, xenon the full 10 million over 3. Defects found do not reset the count.
What an answer would and would not be
A clean run licenses one sentence, which milestone 219's tooling prints on every green result: this machine did N cross-core round trips without the wake gate refusing one, without a wrong reply, and without a worker stalling. It is not proof the concurrency is correct, and the risk's own text is honest that this class of question "produces a confidence rather than a verdict".
A failure is worth far more, and is the outcome to hope for. It would be the first confirmed defect this risk has produced, and the first found by an instrument rather than by somebody watching a bench.
radon, 2026-09-25: clean, 8 h 09 m, 4.1 million crossings
One boot, netbooted, built at 9e879f1e7, watched by script/board-console --for 490m --until none to its deadline (exit 0). First beat checked before calef left: wakerate=430/s settling to
403, crossings 747 then 1,445 then rising about 140 a second. Last beat:
| rounds | rate | wakes | crossings | refused / mismatch / stalled |
|---|---|---|---|---|
| 10,193,815,048 | 350,753/s | 11,747,350 (404/s) | 4,108,581 | 0 / 0 / 0 |
radon did 4.1 million cross-core thread handoffs and 10.2 billion IPC round trips over 8.16 hours
without the wake gate refusing a wake, without a wrong reply, and without a worker stalling. That
is the sentence and all of it. No red means the QEMU cross-check a red would have needed never
arose. The account, the anomalies (none of them a failure) and what it does and does not rule out
are notes/visionfive2.md's "The eight-hour soak, 2026-09-25"; the log is
bench/radon-2026-09-25/soak-8h.log; the exposure row is E4 in notes/multicore-defect-curve.md.
Why eight hours: This block prescribes no duration, so the lane proposed one against crossings
rather than clock time, per notes/soak.md's duration section. On a fast draw 8 hours is 1.4 to 5.4
million crossings, against 5,507 in the only earlier multi-hour run. Past that, a second boot buys
a new draw of the placement lottery, which is worth more than a ninth hour. The maintainer approved
it. What remains on radon is more boots, not longer ones.
radon, 2026-10-09 to 10: §259 met, 10.29 million crossings over 3 plain boots
Lane milestone/225-radon-boots (bef2b40dc, tree-identical to main 237cef6bc), one power cycle
from calef for the whole evening. It opened with the decisive bench test of milestone 592 (radon's
cold reboot dies in OpenSBI's PMIC write), green. The rebooting build soaked its 120 seconds,
called SBI SRST, and the board came back through U-Boot SPL to a netboot and a soak. So every
boot after the first started itself, the board re-fetching over TFTP on each self-reboot; the lane
swapped the served image during one reset's dark period. Three draws, zero defects:
| row | boot | duration | rate | crossings |
|---|---|---|---|---|
| E5 | the rebooting soak's 120s draw | 2m | 314,841/s | 20,474 |
| E6 | plain soak | 10h 17m | 178,629/s | 5,569,327 |
| E7 | plain soak | 3h 53m | 317,457/s | 610,897 |
Counting plain boots only, E4 + E6 + E7 = 10,288,805 crossings over 3 boots, which meets §259's
standard (at least 10 million over at least 3); E5's reboot draw adds 20,474 on top. The evening's
account, including the 592 transcript's one gap and the discarded card boot before E7, is
notes/soak.md, "radon, 2026-10-09 to 10"; the logs are bench/radon-2026-10-10/.
radon, 2026-10-20: 13 reboot draws, zero defects
Lane milestone/225-radon-soak-draw, image built at 22c19e1d5 with script/board-image --soak --reboot (SEALED, features board,soak_test,reboot_soak_test). The QEMU rehearsal
(script/soak-test --arch riscv64 --for 45s) was clean: 787,279 round trips in 40 s, 3,743
crossings. On radon, one power-on, then thirteen 120-second draws, each ended by milestone 592's
direct AXP15060 write and each back through U-Boot SPL and payload came from net: the reset
was clean on 13 of 13. Every last beat reads refused=0 mismatch=0 stalled=0, wakerate 401 to
404/s.
These are rows E13 to E25 in notes/multicore-defect-curve.md. E16 and E22 never crossed cores
(19 and 23 crossings, frozen from the first beat) and are excluded; the other eleven add 218,216
crossings. script/board-console --tally drew one clean core on all thirteen, 182,096 to
197,384/s, so this evening sampled one placement class. The run table is
notes/soak/radon-2026-10-20.md; the capture, the mechanics and how the soak ended are
bench/radon-2026-10-20/README-225.md.
radon, 2026-10-21: 25 reboot draws, zero defects, one unexplained reset
Lane milestone/890-radon-bench-to-prompt, image built on cda4ceb55 with script/board-image --soak --reboot (SEALED). The QEMU rehearsal was clean: 760,115 round trips in 40 s, 4,206
crossings. On radon, one power-on, then 25 draws of about 120 seconds, watched by
script/board-console and stopped with --stop. Every last beat reads refused=0 mismatch=0 stalled=0, wakerate 401 to 402/s.
These are rows E26 to E50 in notes/multicore-defect-curve.md. Seven never crossed cores and are
excluded; the other eighteen add 329,804 crossings. The tally drew one clean core on all
twenty-six boots, the same single placement class as 2026-10-20. Draw 2 (E27) reset itself at
about t=105 s without printing the kernel's reset sequence (BUGS). The run table is
notes/soak/radon-2026-10-21.md; the capture and the mechanics are
bench/radon-2026-10-21/README-225.md.
radon, 2026-10-21 evening: 36 draws that read the PMIC, zero defects
Lane milestone/225-radon-silent-reset, built at 0e0866d93 with script/board-image --soak --reboot --tftp (SEALED). Each draw's arming reads the AXP15060's startup source, PWROK control
and latched interrupt status (die temperature, DCDC under-voltage, the power key), prints them,
and clears the status (reboot::pmic_report). These are rows E51 to E86, 491,341 crossings over
28 crossing draws. Every reset in the capture follows the kernel's rebooting now, and every
PMIC report reads startup 0x00 ... irq-status 0x00 0x00. One draw, E86, drew a placement with no
clean core and ran at 30,857/s, a class E13 to E50 never drew. The run table is
notes/soak/radon-2026-10-21-pmic.md; the capture is bench/radon-2026-10-21/225-pmic-report-draws.log.
What can reset a JH7110 with no line from the kernel
Every reset path this kernel takes prints first (reboot::cold_reset), so a silent reset comes
from outside it:
- A power event. The AXP15060 pulls PWROK when a rail sags, the die overheats or the power key is held. It latches the cause, and the soak now prints it at the next boot.
- A watchdog the firmware armed. None on radon: E27's reset fell at t=105 s, and a firmware watchdog would reset every draw at the same point.
- M-mode firmware. OpenSBI resets only when asked through SBI, and the kernel prints before every SBI reset it asks for.
- A stray store to a reset register in the SYS or AON clock-and-reset blocks. No such store has been seen, and nothing records one.
argon, 2026-10-05: not yet a one-command run, and exactly why
(Awaiting the board, 2026-10-06: what is on the desk is a TK1 going back, not argon. The tegra210 facts below are the TX1's and stand. The "20 minutes at argon" steps wait for the TX1.)
calef ruled argon first on 2026-10-05. argon has never booted nife, and as built it cannot. The
aarch64 kernel is linked, mapped and consoled for QEMU virt only (RAM at 0x4000_0000, a PL011 at
0x0900_0000), and tegra210 puts DRAM at 0x8000_0000 and a 16550 at 0x7000_6000. A booti today
would be silent, and that silence would be misread at the bench as cabling or firmware. Milestone
127's two named prerequisites are built; the third, the board memory map, is unbuilt and unowned.
design/roadmap/0803-argon-boots-the-aarch64-kernel.md is that work, with the fork (one binary or
two) that is the architect's.
What this lane built instead, which every board's soak uses: script/board-console --exposure <log> --machine <name> --build <sha> --start '<utc>' reads a capture into the curve's exposure row
in notes/multicore-defect-curve.md, with the four figures above and milestone 221's two bench
checks redone after the fact. Its test reads radon's eight-hour log back into E4.
What calef can do at argon today, with no nife image (about 20 minutes)
These are milestone 127's steps 1 and 2 and its USB question, and they need nothing built. They
answer the proposal's one open fact (the DRAM base) and capture the prologue script/board-console
needs before it will accept --board argon.
- Cable: a 3.3 V USB-TTL adapter on argon's J21 header (TX, RX, GND; adapter VCC unconnected), on
patagonia. Check nobody holds the port:
lsof /dev/cu.usbserial-*. screen /dev/cu.usbserial-* 115200, thenCtrl-a Hto log toscreenlog.0.- Power argon with no SD card. Expected: U-Boot's banner and an autoboot countdown. Silence is the cable, the baud, or an L4T too old to reach U-Boot; stop there and say which.
- Press a key to stop autoboot, then type:
bdinfo,printenv fdt_addr_r kernel_addr_r, and, with a FAT32 stick in,usb start,usb storage,fatls usb 0:1 /,help bootefi,printenv boot_targets. Ctrl-a kto quit. Hand the lanescreenlog.0; it goes tobench/argon-<date>/uboot.log.
Red here is any of: no U-Boot banner, a DRAM bank in bdinfo that is not at 0x8000_0000, or a
hang on usb start. Each is a fact for 127, not a failure of this milestone.
The soak itself, once argon prints the banner
Unchanged from radon's procedure (notes/soak.md, "On radon at a bench"), with argon's names. The
two commands marked not yet are the proposal's items 4 and the profile.
- Not yet:
script/board-image --soakfor argon, onto the SD card. - Not yet:
script/board-console --board argon --for 8h --until none --log target/argon-soak-$(date +%s).log, started before power-on. - Read the first beat:
wakerateabout 400 (four A57s at 100 Hz) andcrossingsrising. - Afterwards:
script/board-console --exposure target/argon-soak-<stamp>.log --machine argon --build <sha> --start '<utc>'. Exit 0 is clean, 1 is a failure to classify.
Eight hours, for radon's reason. Red is soak-test: FAILED, a [PANIC], three missed beats, or
--exposure exiting 1. Any of them is the outcome worth hoping for: the first defect on silicon.
BUGS
- The duration is now stated: §259 (a multicore soak counts toward risk 5 at ten million crossings over three boots), ruled 2026-10-07 UTC, sets at least 10 million crossings per architecture across at least 3 boots. The radon run's 8 hours, chosen before the standard, gave 4.1 million in one boot. Met for radon 2026-10-10: 10,288,805 over 3 plain boots.
- One radon boot is one draw. It drew the fastest arrangement seen so far, and a slow draw crosses about 275 times less often, so the clean result says little about slow arrangements.
- A hung board needs a person, since nothing can power-cycle radon remotely (milestone 224) and
script/board-consolereads without writing. - radon reset once with no reset sequence printed: E27, 2026-10-21, between t=105 s and t=110 s
of a 120 s draw. The kernel's
window reachedand AXP15060 lines are absent, nobody touched the board or its outlet, and no watchdog is armed. Its cause is not known. It has not recurred in the 65 draws captured since (E51 to E86, and 29 more the same afternoon summarized but not kept), and the PMIC report means a recurrence now says whether it was a power event. - The crossing count varies by more than 2x between identical runs, recorded in milestone 221's BUGS, so it is not a figure to compare machines on without more care than a single run affords.
- argon has never booted nife at all, so its soak sits behind milestone 127 (the seL4 machine)
rather than beside radon's. Since 2026-10-05 also behind the unbuilt board memory map in
design/roadmap/0803-argon-boots-the-aarch64-kernel.md: the aarch64 kernel only fits QEMUvirt.
Follow-on
- Outstanding. xenon's soak. It is rank 2 in
briefs/bench-session.md's ready list, behind milestone 261 (the NVMe driver leaves the kernel, on the machine that can finally confine it). Checked 2026-09-25 against that list. - Outstanding. argon's soak, behind milestone 127 (the seL4 machine), since argon has never booted nife. Checked 2026-09-25: 127 is NOT-STARTED. Checked again 2026-10-05: still NOT-STARTED, and behind it milestone 803 (argon boots the aarch64 kernel), which a lane can build without the board. Checked 2026-10-06: also behind argon's delivery; the seller shipped a TK1, which is going back, and the TX1 has no date.
- Outstanding. More radon boots, because one boot is one draw and a slow draw has never been soaked for long with this build. Checked 2026-09-25: E4 is the only radon row with a log. Updated 2026-10-10: §259's count is met (E4, E6, E7), so further radon boots are draws for the placement distribution rather than owed to the standard, and since milestone 592's reset is proven they cost no plug cycle; unowned. E13 to E85 all drew one clean core; E86 drew none. E87 to E138 (2026-10-22) drew one on 46 and none on 6, all clean, and E138 then soaked 0.63 h. The status stays PARTIAL: argon and xenon have not run it.
- Outstanding. The reset on E27 that printed no reset sequence (
BUGS) waits for a recurrence; none came in E87 to E138. The candidates are listed above, and every rebooting soak on radon now prints the PMIC's record. - Done. The false
NOT SEALEDon a soak build that cost this run half an hour. Milestone 563 (a seal check that reads bytes cannot see a check that was dropped) carried it, merged 2026-09-26: soak builds now seal, andscript/board-image --soakprintedSEALEDon a rebuild.
Index row
radon met §259 on 2026-10-10: 10.29 million crossings over 3 plain boots, zero defects, and its board now resets itself (592 proven); argon and xenon have not run it