roadmap BUILT

755. basalt v0 pins nife and runs its gate

(Title and slug are drafts.) From calef's ruling of 2026-10-04 (UTC), recorded in §247 (the split begins with basalt holding nife, and procps moves first). basalt v0 is the first step of the repository split. The ruling includes the go-ahead for a lane's first write to nifeos/basalt. The reasoning and the measurements are in notes/the-first-split.md, section 3.

What was built

Built 2026-10-04 (UTC) in nifeos/basalt pull request #1, merged as f5bb505a5. Nothing in this repository changed. Every name below is provisional and calef's to name.

One job, not a matrix per architecture. script/ci-build test runs the three legs in one process; a matrix would run the provisioning (QEMU, toolchain, cache) and the host pass three times to buy a status per leg. The same answer at equal effort: basalt then depends on one command name in nife, and the legs are whatever the pinned commit says they are.

A pull request, not a push, for the bump. A pin change is then one reviewable, revertible commit with the gate run on it. A nife commit that fails the gate is a red pull request, not a red main. nife is public, so no token reads it.

What proves it

run pin result job wall time of which billable
37224826206 e2ee49717 (nife main at the pin) green, all three architectures 15 min 25 s QEMU built cold 4 min 18 s, bootstrap 1 min 21 s, ci-build test 9 min 14 s 0
37225450461 e7c4f0219 (known bad) red, as predicted 6 min 32 s QEMU built cold 4 min 12 s, bootstrap 1 min 23 s, ci-build test 36 s 0

BUGS

Follow-on

Index row

The first step of the repository split, ruled by calef 2026-10-04. basalt, the distribution repository, pins nife at a commit in pins.toml and runs that commit's own script/ci-build test on all three architectures. It is green on a current pin and red on a known-bad one, and a daily job proposes the next pin as a pull request.